Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 7,500 LF of silt fence; 600 SY asphaltic concrete pavement patching; 34,600 lf pf 20" pvc c-900 water main pipe; 100 LF of 1" hdpe water service; 50 LF of 30" bore or jack steel casing pipe; 3,810 LF of 24" sdr 11 hdpe or 20" fusible pvc water main pipe, directionally bored. 15 EA inlet protection, install and maintain, complete; 150 LF ditch checks, complete; 5,000 LF sediment erosion logs, complete; 50 EA culvert pipe checks, complete; 3 EA temporary timber clear span bridge, complete; 1 LS temporary traffic control, complete; 565 LF abandon water main, 8", complete; 3,150 LF abandon water main, 10", complete; 80 LF concrete curb & gutter, remove and replace, 36", complete; 100 SY geogrid reinforcement, type I, complete; 100 SY non-woven geotextile, type SAS, complete. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
For 16" Water Transmission Main Project.
Posted Date
Jan 5, 2026
Due Date
Jan 27, 2026
Release: Jan 5, 2026
Close: Jan 27, 2026
For 16" Water Transmission Main Project.
AvailableTo perform safe drinking water act sampling, monitoring, reporting, and support services services.
Posted Date
Dec 31, 2025
Due Date
Feb 6, 2026
Release: Dec 31, 2025
Close: Feb 6, 2026
To perform safe drinking water act sampling, monitoring, reporting, and support services services.
AvailableConstruction of Water Transmission Improvements, specifically +/- 2,318 LF of 30-inch RJ DIP Waterline and one tie-in to an existing 30-inch ductile iron water main.
Posted Date
-
Due Date
Jan 23, 2026
Close: Jan 23, 2026
Construction of Water Transmission Improvements, specifically +/- 2,318 LF of 30-inch RJ DIP Waterline and one tie-in to an existing 30-inch ductile iron water main.
AvailableProcurement of Safe Drinking Water Testing Kits for the Louisiana Department of Health, Office of Public Health.
Posted Date
-
Due Date
Jan 28, 2026
Release: -
Close: Jan 28, 2026
Procurement of Safe Drinking Water Testing Kits for the Louisiana Department of Health, Office of Public Health.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis