Summary
Work includes approx. 5,227 LF of pre-rehabilitation sewer main cleaning-flushing (remaining pipelines); 5,227 LF of pre-rehabilitation sewer main CCTV inspection (Remaining Pipelines); 5,227 LF of post-rehabilitation CCTV inspection (remaining pipelines); 1,129 LF of pre-rehabilitation sewer main cleaning-flushing (MH M9M51 to M9M48); 1,129 LF of pre-rehabilitation sewer main CCTV inspection (MH M9M51 to M9M48); 1,129 LF of post-rehabilitation CCTV inspection (MH M9M51 to M9M48); 1,129 LF of rehabilitate 21" sanitary sewer pipe (MH M9M51 to M9M48); 4,890 LF of rehabilitate 21" sanitary sewer pipe (Remaining Pipelines); 337 LF of Rehabilitate 8" sanitary sewer pipe; 291 VF of rehabilitate and line existing 48" manhole (remaining manholes); 57 VF of rehabilitate and line existing 48" manhole (M9M48 through M9M51); see outside link for more details.