Summary
Roadway pavement repairs within the Borough. The project also includes the excavation of test pits for Properties requiring water service Investigations / Verifications within David Street, John Street, Charles Street, Robert Street, Adams Place and Harding Avenue rights-of-way. The work involved with these improvements includes the maintenance and protection of traffic; removal of existing galvanized water services and replacement with new copper water service lines including connections to existing water service curb boxes to remain and to existing water meters located within the subject dwellings; removal of existing water service curb box and installation of new curb boxes supplied by others; abandonment of approx. 30 +/- of existing inactive and/or active water services, where ordered; furnishing and installation of new water services including all appurtenances, if and where ordered; abandonment of approx. 20 +/- of existing inactive sanitary sewer laterals; removal / replacement of existing deteriorated sanitary sewer manhole casting; upgrades to existing storm sewer drainage system; cutting / removal of approx. 2,200 SY +/- of existing asphalt pavement; roadway milling of approx. 12,500 SY +/- of existing asphalt pavement; crack / joint preparation and furnishing / installation of approx. 1,000 LF ± of joint sealer, if and where ordered; the installation of dense graded aggregate base course, if and where ordered; installation of approx. 500 tons +/- of hot mix asphalt base course material; resurfacing the roadways with approx. 2,000 tons +/- of hot mix asphalt surface course material; application of approx. 800 LF +/- of pavement stripes / markings (4" wide lines); application of fire hydrant pavement markings (symbols); furnishing and installation of topsoil / seed, if and where ordered; and all other preparation; right-of-way / property restoration and associated work in accordance with the Contract Documents.