Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
City of Garland solicits sealed bids for public works construction to perform paving and associated water, wastewater, and drainage improvements at Emberwood & Sugarberry. Key response requirements: sealed written bid submission (no email/fax), 5% bid bond, Performance/Payment bonds and a 2‑year maintenance bond upon award, completed bid pricing and bidder qualification forms, and adherence to provided plans and geotechnical report; a pre-bid meeting is scheduled.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes paving, water, wastewater & drainage improvements. Approx. 1,700 LF Water 8" DR-18 PVC Furnish & Install; 7,500 SY Conc Paving Saw Remove & Dispose; 2,320 CY Excavation Uncl. Roadway; 2,100 SY sodding; 1,600 SY Sidewalk 4" Class "C" Construct; 1,500 LF Wastewater 8" PVC SDR-26 ASTM D3034 Furnish and Install;
Posted Date
Nov 25, 2025
Due Date
Dec 23, 2025
Release: Nov 25, 2025
Close: Dec 23, 2025
Work includes paving, water, wastewater & drainage improvements. Approx. 1,700 LF Water 8" DR-18 PVC Furnish & Install; 7,500 SY Conc Paving Saw Remove & Dispose; 2,320 CY Excavation Uncl. Roadway; 2,100 SY sodding; 1,600 SY Sidewalk 4" Class "C" Construct; 1,500 LF Wastewater 8" PVC SDR-26 ASTM D3034 Furnish and Install;
AvailableWork includes Remove, salvage, store, and reinstall street light, 4125 SY of ; 896 SY of Construct 4 inch thick, reinforced Class C concrete sidewalk paving ; 151 LF of Furnish & install 3/4" Rehau Municipex water service including co-op and angle stop, tapping saddle and connecting to existing meter ; Implement traffic control, signing, and barricading and all other incidentals See attached file.
Posted Date
Nov 21, 2025
Due Date
Dec 23, 2025
Release: Nov 21, 2025
Close: Dec 23, 2025
Work includes Remove, salvage, store, and reinstall street light, 4125 SY of ; 896 SY of Construct 4 inch thick, reinforced Class C concrete sidewalk paving ; 151 LF of Furnish & install 3/4" Rehau Municipex water service including co-op and angle stop, tapping saddle and connecting to existing meter ; Implement traffic control, signing, and barricading and all other incidentals See attached file.
Construction of phase 1 including all utilities, storm drainage, water and wastewater pipe and appurtenances; excavation and embankment; street improvements including curbs and hmac; water quality ponds; erosion & sedimentation controls; and various other improvements. Approx. 3,000 LF 8" PVC C-900, DR-14 Potable Waterline; 48 LF 12" Ductile Iron Pipe Waterline; 14 EA 8" Gate Valve with Box and Cover; 17 Ea Fire Hydrant Assembly; 1,790 LF 8" PVC SDR-26 Gravity Wastewater Line (10'-12' depth);
Posted Date
Nov 26, 2025
Due Date
Jan 7, 2026
Release: Nov 26, 2025
Close: Jan 7, 2026
Construction of phase 1 including all utilities, storm drainage, water and wastewater pipe and appurtenances; excavation and embankment; street improvements including curbs and hmac; water quality ponds; erosion & sedimentation controls; and various other improvements. Approx. 3,000 LF 8" PVC C-900, DR-14 Potable Waterline; 48 LF 12" Ductile Iron Pipe Waterline; 14 EA 8" Gate Valve with Box and Cover; 17 Ea Fire Hydrant Assembly; 1,790 LF 8" PVC SDR-26 Gravity Wastewater Line (10'-12' depth);
Scope of Work of the Contract Documents includes the following: Water piping, including 8" and 16" PVC pipe and appurtenances; Gravity wastewater piping consisting of 8" and 12" PVC pipe, manholes, and appurtenances; Drainage piping, including approximately 18"-60" RCP, inlets, manholes, headwalls and appurtenances; Excavation, embankment, and paving; Detention ponds, outfall structures, grading and revegetation; Sedimentation and erosion control; and Various other site improvements.
Posted Date
Nov 12, 2025
Due Date
Dec 16, 2025
Release: Nov 12, 2025
Close: Dec 16, 2025
Scope of Work of the Contract Documents includes the following: Water piping, including 8" and 16" PVC pipe and appurtenances; Gravity wastewater piping consisting of 8" and 12" PVC pipe, manholes, and appurtenances; Drainage piping, including approximately 18"-60" RCP, inlets, manholes, headwalls and appurtenances; Excavation, embankment, and paving; Detention ponds, outfall structures, grading and revegetation; Sedimentation and erosion control; and Various other site improvements.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis