Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Garland
Work includes paving, water, wastewater & drainage improvements. Approx. 1,700 LF Water 8" DR-18 PVC Furnish & Install; 7,500 SY Conc Paving Saw Remove & Dispose; 2,320 CY Excavation Uncl. Roadway; 2,100 SY sodding; 1,600 SY Sidewalk 4" Class "C" Construct; 1,500 LF Wastewater 8" PVC SDR-26 ASTM D3034 Furnish and Install;
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
GBRK Edgewood, LLC
Construction of phase 1 including all utilities, storm drainage, water and wastewater pipe and appurtenances; excavation and embankment; street improvements including curbs and hmac; water quality ponds; erosion & sedimentation controls; and various other improvements. Approx. 3,000 LF 8" PVC C-900, DR-14 Potable Waterline; 48 LF 12" Ductile Iron Pipe Waterline; 14 EA 8" Gate Valve with Box and Cover; 17 Ea Fire Hydrant Assembly; 1,790 LF 8" PVC SDR-26 Gravity Wastewater Line (10'-12' depth);
Posted Date
Nov 26, 2025
Due Date
Dec 17, 2025
Release: Nov 26, 2025
GBRK Edgewood, LLC
Close: Dec 17, 2025
Construction of phase 1 including all utilities, storm drainage, water and wastewater pipe and appurtenances; excavation and embankment; street improvements including curbs and hmac; water quality ponds; erosion & sedimentation controls; and various other improvements. Approx. 3,000 LF 8" PVC C-900, DR-14 Potable Waterline; 48 LF 12" Ductile Iron Pipe Waterline; 14 EA 8" Gate Valve with Box and Cover; 17 Ea Fire Hydrant Assembly; 1,790 LF 8" PVC SDR-26 Gravity Wastewater Line (10'-12' depth);
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
East Hays County Municipal Utility District No. 2
Scope of Work of the Contract Documents includes the following: Water piping, including 8" and 16" PVC pipe and appurtenances; Gravity wastewater piping consisting of 8" and 12" PVC pipe, manholes, and appurtenances; Drainage piping, including approximately 18"-60" RCP, inlets, manholes, headwalls and appurtenances; Excavation, embankment, and paving; Detention ponds, outfall structures, grading and revegetation; Sedimentation and erosion control; and Various other site improvements.
Posted Date
Nov 12, 2025
Due Date
Dec 16, 2025
Release: Nov 12, 2025
East Hays County Municipal Utility District No. 2
Close: Dec 16, 2025
Scope of Work of the Contract Documents includes the following: Water piping, including 8" and 16" PVC pipe and appurtenances; Gravity wastewater piping consisting of 8" and 12" PVC pipe, manholes, and appurtenances; Drainage piping, including approximately 18"-60" RCP, inlets, manholes, headwalls and appurtenances; Excavation, embankment, and paving; Detention ponds, outfall structures, grading and revegetation; Sedimentation and erosion control; and Various other site improvements.
AvailableFort Bend County MUD No. 255
Construction of Water, Sewer, and Drainage Improvements With Paving.
Posted Date
Nov 25, 2025
Due Date
Dec 4, 2025
Release: Nov 25, 2025
Fort Bend County MUD No. 255
Close: Dec 4, 2025
Construction of Water, Sewer, and Drainage Improvements With Paving.
AvailableVillage of Lincolnshire
Project consists of main line and lateral storm sewers along Wiltshire Drive, Lincolnshire Drive, and Londonderry Lane that connect to a proposed pump station that discharges into the Des Plaines. The size of the proposed storm sewer ranges from 12" to 60". Key scope of work items includes removal, abandonment and installation of 12" water main via open cut and trenchless methods, relo- cation of a segment of the Lincolnshire Drive sanitary sewer to accommodate the proposed drainage improvements, pavement patching and full pavement reconstruction, construction of a pump station, relocation of an existing pedestrian path and compen satorystor age grading.
Posted Date
Nov 18, 2025
Due Date
Dec 17, 2025
Release: Nov 18, 2025
Village of Lincolnshire
Close: Dec 17, 2025
Project consists of main line and lateral storm sewers along Wiltshire Drive, Lincolnshire Drive, and Londonderry Lane that connect to a proposed pump station that discharges into the Des Plaines. The size of the proposed storm sewer ranges from 12" to 60". Key scope of work items includes removal, abandonment and installation of 12" water main via open cut and trenchless methods, relo- cation of a segment of the Lincolnshire Drive sanitary sewer to accommodate the proposed drainage improvements, pavement patching and full pavement reconstruction, construction of a pump station, relocation of an existing pedestrian path and compen satorystor age grading.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →