Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Village of Lincolnshire
Project consists of main line and lateral storm sewers along Wiltshire Drive, Lincolnshire Drive, and Londonderry Lane that connect to a proposed pump station that discharges into the Des Plaines. The size of the proposed storm sewer ranges from 12" to 60". Key scope of work items includes removal, abandonment and installation of 12" water main via open cut and trenchless methods, relo- cation of a segment of the Lincolnshire Drive sanitary sewer to accommodate the proposed drainage improvements, pavement patching and full pavement reconstruction, construction of a pump station, relocation of an existing pedestrian path and compen satorystor age grading.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Alma
The reconstruction consist of approx 378 LF of Canterbury Drive at its intersection with U.S. Highway 71 and the replacement of an existing storm drain system 580 FT in length along Canterbury Drive from Rudy Road to Kingswood Drive. The items of work include 90 TONS of asphalt concrete overlay; 172 SY of 7" concrete paving; 186 LF of 24"x38" reinforced concrete elliptical storm drain; 423 LF of 3'-6" wide by 1'-6" deep concrete vertical wall channel; 222 LF of 14"x23" reinforced concrete elliptical storm drain, drainage inlets and headwalls, concrete driveway replacement, ditch regrading and other related items.
Posted Date
Nov 22, 2025
Due Date
Dec 17, 2025
Release: Nov 22, 2025
City of Alma
Close: Dec 17, 2025
The reconstruction consist of approx 378 LF of Canterbury Drive at its intersection with U.S. Highway 71 and the replacement of an existing storm drain system 580 FT in length along Canterbury Drive from Rudy Road to Kingswood Drive. The items of work include 90 TONS of asphalt concrete overlay; 172 SY of 7" concrete paving; 186 LF of 24"x38" reinforced concrete elliptical storm drain; 423 LF of 3'-6" wide by 1'-6" deep concrete vertical wall channel; 222 LF of 14"x23" reinforced concrete elliptical storm drain, drainage inlets and headwalls, concrete driveway replacement, ditch regrading and other related items.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Garland
Work includes paving, water, wastewater & drainage improvements. Approx. 1,700 LF Water 8" DR-18 PVC Furnish & Install; 7,500 SY Conc Paving Saw Remove & Dispose; 2,320 CY Excavation Uncl. Roadway; 2,100 SY sodding; 1,600 SY Sidewalk 4" Class "C" Construct; 1,500 LF Wastewater 8" PVC SDR-26 ASTM D3034 Furnish and Install;
Posted Date
Nov 25, 2025
Due Date
Dec 23, 2025
Release: Nov 25, 2025
City of Garland
Close: Dec 23, 2025
Work includes paving, water, wastewater & drainage improvements. Approx. 1,700 LF Water 8" DR-18 PVC Furnish & Install; 7,500 SY Conc Paving Saw Remove & Dispose; 2,320 CY Excavation Uncl. Roadway; 2,100 SY sodding; 1,600 SY Sidewalk 4" Class "C" Construct; 1,500 LF Wastewater 8" PVC SDR-26 ASTM D3034 Furnish and Install;
AvailableGilchrist County
Drainage improvements.
Posted Date
Nov 7, 2025
Due Date
Dec 2, 2025
Release: Nov 7, 2025
Gilchrist County
Close: Dec 2, 2025
Drainage improvements.
AvailableCity of Lakewood
Drainage Improvements.
Posted Date
Nov 6, 2025
Due Date
Dec 2, 2025
Release: Nov 6, 2025
City of Lakewood
Close: Dec 2, 2025
Drainage Improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →