Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Redlands
The City of Redlands Municipal Utilities and Engineering Department invites bids for the installation and replacement of approximately 14,500 linear feet of ductile iron water pipeline, including services, valves, fire hydrants, and related work. Bids are due by December 4, 2025 at 2:00 PM PST.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Eastern New Mexico Water Utility Authority
Construction of Rural Water System Project β RW1A Pipeline.
Posted Date
Nov 5, 2025
Due Date
Feb 25, 2026
Release: Nov 5, 2025
Eastern New Mexico Water Utility Authority
Close: Feb 25, 2026
Construction of Rural Water System Project β RW1A Pipeline.
AvailableCity of Fairfield
The City of Fairfield seeks proposals for construction management and inspection services for the Lopes Road & Water Pipeline Reconstruction Project, involving roadway reconstruction and water pipeline replacement. The project requires compliance with FEMA, FHWA, and CalOES regulations. Proposals must demonstrate relevant experience, technical competence, and the ability to manage projects within scope, schedule, and budget.
Posted Date
Nov 3, 2025
Due Date
Nov 26, 2025
Release: Nov 3, 2025
City of Fairfield
Close: Nov 26, 2025
The City of Fairfield seeks proposals for construction management and inspection services for the Lopes Road & Water Pipeline Reconstruction Project, involving roadway reconstruction and water pipeline replacement. The project requires compliance with FEMA, FHWA, and CalOES regulations. Proposals must demonstrate relevant experience, technical competence, and the ability to manage projects within scope, schedule, and budget.
AvailableCity of Cortez
Work includes incorporation of a new raw water flow control valve and associated process piping and electrical in the micro hydro power building. The project also includes demolition work and provision / installation of structural support members, grating, and pipe supports.
Posted Date
Nov 5, 2025
Due Date
Jan 5, 2026
Release: Nov 5, 2025
City of Cortez
Close: Jan 5, 2026
Work includes incorporation of a new raw water flow control valve and associated process piping and electrical in the micro hydro power building. The project also includes demolition work and provision / installation of structural support members, grating, and pipe supports.
AvailableGarrison Diversion Conservancy District
Construction of approx. 6. 5 mi of 72" dia. Steel water pipeline, including three 96" dia. Trenchless wetland and road crossings. Strict segregation and stockpiling of topsoil and subsoil for pipe installation will be required. The work also includes an impressed current pipeline corrosion protection system, pipeline appurtenances, and all other work specified or shown on the drawings. Work includes, 22,419 LF of 72" steel pipe (class 300) - installed by open cut; 451 LF of trenchless crossing - 72" steel carrier pipe (0.500" thick); 451 LF of trenchless crossing - 96" casing pipe; 120 LF of gravel pavement removal and replacement; 22,870 LF of remove/stockpile topsoil.
Posted Date
Oct 27, 2025
Due Date
Nov 21, 2025
Release: Oct 27, 2025
Garrison Diversion Conservancy District
Close: Nov 21, 2025
Construction of approx. 6. 5 mi of 72" dia. Steel water pipeline, including three 96" dia. Trenchless wetland and road crossings. Strict segregation and stockpiling of topsoil and subsoil for pipe installation will be required. The work also includes an impressed current pipeline corrosion protection system, pipeline appurtenances, and all other work specified or shown on the drawings. Work includes, 22,419 LF of 72" steel pipe (class 300) - installed by open cut; 451 LF of trenchless crossing - 72" steel carrier pipe (0.500" thick); 451 LF of trenchless crossing - 96" casing pipe; 120 LF of gravel pavement removal and replacement; 22,870 LF of remove/stockpile topsoil.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis