Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
2025 CAPITAL IMPROVEMENTS - POINT and GRP UV CIPP PROJECT includes the point repair of approx. 125 LF of active 8” VCP sanitary mains at eleven (11) locations, including 3 additional manhole installations; 1,600 LF 8” GRP UV CIPP lining and 330 LF of 10" GRP UV CIPP lining of sanitary mains and a separate trimming of 1 protruding PVC tap. The project is situated in the Sanitation District, southwest of West 32nd Avenue and I-70. The majority of the work is on residential streets.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of 420 LF of 8" GRP UV CIPP line between MH #128 - MH #83, as per contract documents; 385 LF of 8" GRP UV CIPP line between MH #17 - MH #16, as per contract documents; 349 LF of 8" GRP UV CIPP line between MH #242 - MH #243, as per contract documents; 236 LF of 8" GRP UV CIPP line between MH #165 - MH #164, as per contract documents; 248 LF of 8" GRP EV CIPP line between MH #40 - MH #39, as per contract documents; 204 LF of 8" GRP UV CIPP line between MH #240 - MH #241, as per contract documents; see the outside link for more details.
Posted Date
Dec 18, 2025
Due Date
Jan 23, 2026
Release: Dec 18, 2025
Close: Jan 23, 2026
Project consists of 420 LF of 8" GRP UV CIPP line between MH #128 - MH #83, as per contract documents; 385 LF of 8" GRP UV CIPP line between MH #17 - MH #16, as per contract documents; 349 LF of 8" GRP UV CIPP line between MH #242 - MH #243, as per contract documents; 236 LF of 8" GRP UV CIPP line between MH #165 - MH #164, as per contract documents; 248 LF of 8" GRP EV CIPP line between MH #40 - MH #39, as per contract documents; 204 LF of 8" GRP UV CIPP line between MH #240 - MH #241, as per contract documents; see the outside link for more details.
AvailableProject consists of one prime Contract bid as a Base Bid and generally consists of the following: traffic control; bypass pumping, cleaning & televising the existing 36-inch sanitary sewer, 36-inch CIPP liner, testing & sealing lateral connections; and any necessary erosion control to complete the work. Pre-construction closed circuit televising reports are available upon request.
Posted Date
Jan 9, 2026
Due Date
Jan 30, 2026
Release: Jan 9, 2026
Close: Jan 30, 2026
Project consists of one prime Contract bid as a Base Bid and generally consists of the following: traffic control; bypass pumping, cleaning & televising the existing 36-inch sanitary sewer, 36-inch CIPP liner, testing & sealing lateral connections; and any necessary erosion control to complete the work. Pre-construction closed circuit televising reports are available upon request.
Procurement of materials, labor, equipment, and installation services for the 2025-2026 Locust Street -- Street Improvements Project.
Posted Date
Dec 29, 2025
Due Date
Jan 22, 2026
Release: Dec 29, 2025
Close: Jan 22, 2026
Procurement of materials, labor, equipment, and installation services for the 2025-2026 Locust Street -- Street Improvements Project.
Available2025-26 capital outlay project.
Posted Date
Dec 31, 2025
Due Date
Jan 21, 2026
Release: Dec 31, 2025
Close: Jan 21, 2026
2025-26 capital outlay project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis