Summary
Work consists of 2,550 TON bituminous pavement; 35 CY aggregate surfacing; 90 LF 18" pipe sewer. Work includes, 126 LF of remove pipe culverts; 860 LF of sawing bituminous pvmt; 743 SY of remove bituminous pavement; 208 CY of common excavation; 425 SY of geotextile fabric type 7; 40 CY of aggregate surfacing (cv) class 5; 210 CY of shoulder base aggregate (cv) class 5; 639 TON of bituminous patching mixture; 727 SY of bituminous patch special 1; 241 SY of bituminous patch special 2; 1,901 TON of type sp 9.5 wearing course mix (2,b); 183 LF of concrete curb & gutter des b618; 470 LF of silt fence, type ms; 351 SY of rolled erosion prevention category 20; 5,905 LF of 4" broken line multi comp (wr); 351 SY of rolled erosion prevention category 20; 98 CY of common topsoil borrow (lv); 26 sy of geotextile filter type 7; 32 sy of geotextile filter type 4.