Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work to be performed consists of installing approx. 6 miles of 1 1/2 thick SP-9.5 asphalt and other associated work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Elk Grove (Public Works) issued an Invitation to Bid for the 2025 Pavement Maintenance Project - Overlay (WPR025) to rehabilitate existing pavement using Partial Depth Recycling with Foamed Asphalt, install a Hot Mix Asphalt overlay, reconstruct curb and gutters, and restripe traffic markings. The Opinion of Probable Cost is $6,015,025 and the project requires City pre-qualified bidders, registration with the California Department of Industrial Relations, and a current Class A General Engineering and/or Class C-12 Earthwork and Paving license. Bids are to be submitted electronically through the City’s PlanetBids vendor portal; bids are due 2026-02-12 at 10:00 AM PST and the posting date is 2026-01-15 at 7:05 AM PST.
Posted Date
Jan 15, 2026
Due Date
Feb 12, 2026
Release: Jan 15, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 12, 2026
The City of Elk Grove (Public Works) issued an Invitation to Bid for the 2025 Pavement Maintenance Project - Overlay (WPR025) to rehabilitate existing pavement using Partial Depth Recycling with Foamed Asphalt, install a Hot Mix Asphalt overlay, reconstruct curb and gutters, and restripe traffic markings. The Opinion of Probable Cost is $6,015,025 and the project requires City pre-qualified bidders, registration with the California Department of Industrial Relations, and a current Class A General Engineering and/or Class C-12 Earthwork and Paving license. Bids are to be submitted electronically through the City’s PlanetBids vendor portal; bids are due 2026-02-12 at 10:00 AM PST and the posting date is 2026-01-15 at 7:05 AM PST.
AvailableMultimodal Pathway Overlay Project. Patching, asphalt paving fabric placement and paving.
Posted Date
Jan 12, 2026
Due Date
Jan 30, 2026
Release: Jan 12, 2026
Close: Jan 30, 2026
Multimodal Pathway Overlay Project. Patching, asphalt paving fabric placement and paving.
Available2025-26 capital outlay project.
Posted Date
Dec 31, 2025
Due Date
Jan 21, 2026
Release: Dec 31, 2025
Close: Jan 21, 2026
2025-26 capital outlay project.
AvailableAsphalt concrete shall be placed on existing roads within the City. Improvements include grinding of pavement, 1-1/2” placement of rubberized asphalt concrete, localized street reconstruction, curb ramp improvements for accessibility, utility cover adjustments and replacement of traffic striping, markers and markings. Location of work includes various areas throughout the City.
Posted Date
Jan 9, 2026
Due Date
Jan 29, 2026
Release: Jan 9, 2026
Close: Jan 29, 2026
Asphalt concrete shall be placed on existing roads within the City. Improvements include grinding of pavement, 1-1/2” placement of rubberized asphalt concrete, localized street reconstruction, curb ramp improvements for accessibility, utility cover adjustments and replacement of traffic striping, markers and markings. Location of work includes various areas throughout the City.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →