Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of 3,785 SF of sawcut, removal, and reconstruction of sidewalk, 84 sawcut, removal, and reconstruction of curb ramps, 2 sawcut and remove ramp portion of existing curb ramp and wet set truncated domes, 2,732 SF of sawcut, removal, and reconstruction of concrete cross and/or longitudinal gutter, 1,427 LF of concrete sidewalk grinding, 17 LF of sawcut, removal, and reconstruction of concrete curb and gutter, 195 SF of sawcut, removal, and reconstruction of residential driveway.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 50 l. F. Of root pruning; 50 l. F. Of root barrier placement; 169,268 s. F. Of 1 1/2" full width coldmilling; 1,090 s. F. Of pcc sidewalk replacement; 165 s. F. Pcc cross gutter replacement; 73 l. F. Of pcc curb and gutter replacement; 4 curb ramp reconstructions; 156 l. F. Of pcc sidewalk grinding; 220 s. F. Of sawcut, removal, and reconstruction of residential concrete driveway approach; 455 s. F. Of sawcut, removal, and reconstruction of commercial concrete driveway approach; 1,600 tons of asphalt rubberized hot mix placement; ventura county survey monument adjustment; 36 water valve box, cover, and riser removal and replacements; 12 sewer manhole frame, ring, cover removal and replacements; traffic signing and pavement delineation. See attached files.
Posted Date
Dec 22, 2025
Due Date
Jan 20, 2026
Release: Dec 22, 2025
Close: Jan 20, 2026
Work includes 50 l. F. Of root pruning; 50 l. F. Of root barrier placement; 169,268 s. F. Of 1 1/2" full width coldmilling; 1,090 s. F. Of pcc sidewalk replacement; 165 s. F. Pcc cross gutter replacement; 73 l. F. Of pcc curb and gutter replacement; 4 curb ramp reconstructions; 156 l. F. Of pcc sidewalk grinding; 220 s. F. Of sawcut, removal, and reconstruction of residential concrete driveway approach; 455 s. F. Of sawcut, removal, and reconstruction of commercial concrete driveway approach; 1,600 tons of asphalt rubberized hot mix placement; ventura county survey monument adjustment; 36 water valve box, cover, and riser removal and replacements; 12 sewer manhole frame, ring, cover removal and replacements; traffic signing and pavement delineation. See attached files.
AvailableProcurement of services for the rehabilitation of localized streets in Pearl City / Aiea, Oahu, Hawaii.
Posted Date
-
Due Date
Dec 31, 2026
Close: Dec 31, 2026
Procurement of services for the rehabilitation of localized streets in Pearl City / Aiea, Oahu, Hawaii.
Available74 LF reconstructed concrete curb and gutter; 3,761 SF reconstructed concrete sidewalk, including labor for adjustment and/or replacement of utility structures within sidewalk reconstruction limits; 181 ea tree root pruning and canopy pruning; tree removal; new sign(s) and post.
Posted Date
Dec 22, 2025
Due Date
Feb 4, 2026
Release: Dec 22, 2025
Close: Feb 4, 2026
74 LF reconstructed concrete curb and gutter; 3,761 SF reconstructed concrete sidewalk, including labor for adjustment and/or replacement of utility structures within sidewalk reconstruction limits; 181 ea tree root pruning and canopy pruning; tree removal; new sign(s) and post.
Available24 LF reconstructed concrete curb and gutter; 3,715 SF reconstructed concrete sidewalk, including labor for adjustment and/or replacement of utility structures within sidewalk reconstruction limits; 56 ea tree root pruning and canopy pruning; tree removal; new sign(s) and post.
Posted Date
Dec 22, 2025
Due Date
Jan 29, 2026
Release: Dec 22, 2025
Close: Jan 29, 2026
24 LF reconstructed concrete curb and gutter; 3,715 SF reconstructed concrete sidewalk, including labor for adjustment and/or replacement of utility structures within sidewalk reconstruction limits; 56 ea tree root pruning and canopy pruning; tree removal; new sign(s) and post.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis