Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes but is not limited to the installation of video inspection of sewer lines, cipp lining and cipp lateral linings and all other associated work required to complete the project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
General Contract for the construction of a sewer rehabilitation project, including video inspection of sewer lines, CIPP lining, and CIPP lateral linings.
Posted Date
Jan 7, 2026
Due Date
Feb 5, 2026
Release: Jan 7, 2026
Close: Feb 5, 2026
General Contract for the construction of a sewer rehabilitation project, including video inspection of sewer lines, CIPP lining, and CIPP lateral linings.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The buyer is soliciting bids to rehabilitate existing sewer main infrastructure under the project titled “BWSD - 2026 Sewer Main Rehabilitation Project” on the Rocky Mountain E‑Purchasing System. The solicitation was published on 2026‑01‑06 and bids are due on 2026‑02‑06 at 10:00 AM MST. Detailed specifications and documents are available to registered vendors on BidNet Direct.
Posted Date
Jan 6, 2026
Due Date
Feb 6, 2026
Release: Jan 6, 2026
Close: Feb 6, 2026
The buyer is soliciting bids to rehabilitate existing sewer main infrastructure under the project titled “BWSD - 2026 Sewer Main Rehabilitation Project” on the Rocky Mountain E‑Purchasing System. The solicitation was published on 2026‑01‑06 and bids are due on 2026‑02‑06 at 10:00 AM MST. Detailed specifications and documents are available to registered vendors on BidNet Direct.
AvailableWork includes sewer cured in place rehabilitation project shall include, but not be limited to, obtaining a encroachment permits from the city, providing traffic control, public notifications, cleaning of sewer lines prior to insertion of cured in place pipe resin impregnated flexible liner, cleaning of manholes prior to rehabilitation of the manhole by lining, inspection of pipelines via closed circuit television before and after liner pipe installation, bypassing manholes, bypass pumping and/or diversion of sewage flows, reconnecting service laterals and cleanup.
Posted Date
Dec 23, 2025
Due Date
Feb 6, 2026
Release: Dec 23, 2025
Close: Feb 6, 2026
Work includes sewer cured in place rehabilitation project shall include, but not be limited to, obtaining a encroachment permits from the city, providing traffic control, public notifications, cleaning of sewer lines prior to insertion of cured in place pipe resin impregnated flexible liner, cleaning of manholes prior to rehabilitation of the manhole by lining, inspection of pipelines via closed circuit television before and after liner pipe installation, bypassing manholes, bypass pumping and/or diversion of sewage flows, reconnecting service laterals and cleanup.
AvailableOutfall sewer rehabilitation project work includes 5 EA repair manhole channel and bench; 5 EA furnish and install cured-in-place manhole liner; 1 EA furnish and install high-build epoxy to manhole interior; see attached file.
Posted Date
Dec 15, 2025
Due Date
Jan 20, 2026
Release: Dec 15, 2025
Close: Jan 20, 2026
Outfall sewer rehabilitation project work includes 5 EA repair manhole channel and bench; 5 EA furnish and install cured-in-place manhole liner; 1 EA furnish and install high-build epoxy to manhole interior; see attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →