Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes up to 124 full lead service line replacements from the watermain to the water meter, up to 32 replacements of the home portion only (from the curb stop to the water meter) and up to 8 replacements of the street portion only (from the watermain to the curb stop). Work may include, but is not limited to, the procurement of street, plumbing and electrical permits, coordinating and scheduling the installation with the property owner, installation of a new water service line utilizing trenchless technology, abandonment of the lsl, water meter installation, reconnection to the interior water distribution piping, residential cross connection inspection, electrical grounding modifications, and street restoration (if applicable). Also includes 15-40 LF of 1.25 PE water service (bored). See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Roof replacements.
Posted Date
Jan 20, 2026
Due Date
Feb 11, 2026
Release: Jan 20, 2026
Close: Feb 11, 2026
Roof replacements.
AvailableParking Lot Replacements.
Posted Date
Jan 9, 2026
Due Date
Jan 27, 2026
Release: Jan 9, 2026
Close: Jan 27, 2026
Parking Lot Replacements.
AvailableWork includes band tower replacements.
Posted Date
Jan 15, 2026
Due Date
Jan 29, 2026
Release: Jan 15, 2026
Close: Jan 29, 2026
Work includes band tower replacements.
AvailableThe project consists of approx 33 EA of Sanitary Lateral connection to main; 33 EA of 1 1/4" of water service main to curb; 2,340 LF of CCTV Sanitary lateral pre-construction; 2,340 LF of 6" Sanitary Sewr Lateral; 820 SY of HMA Pavement. See outside link.
Posted Date
Jan 12, 2026
Due Date
Jan 27, 2026
Release: Jan 12, 2026
Close: Jan 27, 2026
The project consists of approx 33 EA of Sanitary Lateral connection to main; 33 EA of 1 1/4" of water service main to curb; 2,340 LF of CCTV Sanitary lateral pre-construction; 2,340 LF of 6" Sanitary Sewr Lateral; 820 SY of HMA Pavement. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis