Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
York County, PA (Owner) requests bids under an IFB for the 2023 Bridge Replacement Program to perform superstructure replacement of York County Bridge No. 24 (Garvine Mill Road over Bald Eagle Creek in Fawn Township) and full replacement of York County Bridge No. 65 (Strickler School Road over Kreutz Creek in Hellam Township). Bids must be submitted online via the PennBID portal and will be publicly opened on Jan 27, 2026 at 10:00 AM local time; a 10% bid bond/security is required and the Pennsylvania Prevailing Wage Act applies. Bidding documents (project manual and bridge plans) are posted on the PennBID portal (listed files dated Dec 19, 2025) and all official addenda/notifications will be distributed there.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Conducting a Project Development & Environment (PD&E) study to evaluate the proposed replacement of the Drive bridge.
Posted Date
Oct 23, 2023
Due Date
Jul 1, 2026
Release: Oct 23, 2023
Close: Jul 1, 2026
Conducting a Project Development & Environment (PD&E) study to evaluate the proposed replacement of the Drive bridge.
AvailableBridge replacement project which includes the removal of the existing two span steel i-beam bridge structure and replacement with a new single span pre-stressed concrete box girder bridge.
Posted Date
Nov 13, 2025
Due Date
Jan 8, 2026
Release: Nov 13, 2025
Close: Jan 8, 2026
Bridge replacement project which includes the removal of the existing two span steel i-beam bridge structure and replacement with a new single span pre-stressed concrete box girder bridge.
AvailableRequest for proposals for the Bridge Replacement Project for Poga 1 (Bridge ID No. 10S25200001) and Poga 2 (Bridge ID No. 10S25200003) over Elk River in Elizabethton, TN.
Posted Date
Dec 5, 2025
Due Date
Jan 15, 2026
Release: Dec 5, 2025
Close: Jan 15, 2026
Request for proposals for the Bridge Replacement Project for Poga 1 (Bridge ID No. 10S25200001) and Poga 2 (Bridge ID No. 10S25200003) over Elk River in Elizabethton, TN.
AvailableThe scope of work includes but is not limited to; removal & replacement of the existing avenue bridge over creek; construct new cast-in-place concrete bridge, replace existing sewer siphon, perform drainage improvements, new pavement, curb, gutter and sidewalk construction, retaining walls and installation of signing and striping.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Close: Jan 15, 2026
The scope of work includes but is not limited to; removal & replacement of the existing avenue bridge over creek; construct new cast-in-place concrete bridge, replace existing sewer siphon, perform drainage improvements, new pavement, curb, gutter and sidewalk construction, retaining walls and installation of signing and striping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis