Retrieving RFP details
Release
Close
City of Fairhope
Provide all materials, personnel, tools, equipment, pipe, welders, tap/stops, CWI, pipe size & wall thickness, verification methods, soil/hole stabilization, erosion control (temporary and permanent), trench boxes, connections, taps, sod/hay, restoration, etc. That is necessary to extend a high-pressure gas main via directional drilling. The project will be for approximately 6,000 feet of 2" steel double (.280 wall) dual coating. See attached file for full scope.
Bid 260132025PGI005 CR 32 Greeno Rd 2inch HP Gas Main
City of Eatonton
Installation of approx. 11,200 LF of 6" high pressure steel gas main. The work also consists of trenched and untrenched installation, line valves, connections, and other related appurtenances.
City of LaBelle
Work includes construction of approximately 13,600 linear feet of 12" pvc (dr-18) water main by open cut, 400 linear feet of 12" pvc (dr-14) water main by open cut, and two (2) linear feet of 10" pvc (dr-18) water main by open cut with associated fittings, twenty-eight (28) fire hydrants, twenty-eight (28) 12" vertical gate valves, and two (2) 10" vertical gate valves. Connections to the existing water main will be made at two (2) points by using fittings such as tapping sleeve and valve. Eight (8) connections for future development are proposed to be included.
City of Salisbury
Construction of a 16" water main extension, 8" water main and includes installation of the water main by horizontal directional drilling. The work also includes removal of existing roadway pavement for the installation of new 16" and 8" water mains. It also includes full depth pavement reconstruction, mill and overlay of existing pavement.
Release
Oct 31, 2025
Close
Dec 02, 2025