Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Dorsey Water Association (Itawamba County, MS) is soliciting separate and sealed bids for Contract E: Line Abandonment and Meter Reconnection. The work includes approximately 28 water meter reconnections along with associated service tubing, encasements, saddles, corporation stops, wet/machine taps, and gate valves to maintain service during abandonment of existing lines. Bids are due at 10:00 AM local time on January 27, 2026, and the project is funded in part by ARPA’s Rural Water Associations Infrastructure Grant (RWAIG).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking proposals for construction services related to line abandonment and meter reconnection, including installation of service tubing, wet taps, and gate valves for approximately 28 meter reconnections.
Posted Date
Dec 26, 2025
Due Date
Jan 27, 2026
Release: Dec 26, 2025
Close: Jan 27, 2026
Seeking proposals for construction services related to line abandonment and meter reconnection, including installation of service tubing, wet taps, and gate valves for approximately 28 meter reconnections.
AvailableWork includes includes various wet taps, machine taps, gate valves and appurtenances required to maintain water service during the abandonment of existing water lines.
Posted Date
Dec 26, 2025
Due Date
Jan 27, 2026
Release: Dec 26, 2025
Close: Jan 27, 2026
Work includes includes various wet taps, machine taps, gate valves and appurtenances required to maintain water service during the abandonment of existing water lines.
AvailableThe Town of St. Francisville is soliciting sealed bids for Contract No. 3: the decommissioning and abandonment (closure in-place) of the existing sewer oxidation/wastewater treatment pond (PEC Project No. 11516-3). Sealed bids must be delivered to the Town Hall at 11936 St. Ferdinand Street (P.O. Box 400) and will be publicly opened and read aloud at 2:00 p.m. on January 12, 2026. Complete bid documents (plans, specifications, bid forms, and bond forms) are available from the Professional Engineering Consultants (PEC) Plan Room hosted by Central Bidding (CentralAuctionHouse/CentralBidding) subject to the site’s access/fee requirements.
Posted Date
Dec 10, 2025
Due Date
Jan 12, 2026
Release: Dec 10, 2025
Close: Jan 12, 2026
The Town of St. Francisville is soliciting sealed bids for Contract No. 3: the decommissioning and abandonment (closure in-place) of the existing sewer oxidation/wastewater treatment pond (PEC Project No. 11516-3). Sealed bids must be delivered to the Town Hall at 11936 St. Ferdinand Street (P.O. Box 400) and will be publicly opened and read aloud at 2:00 p.m. on January 12, 2026. Complete bid documents (plans, specifications, bid forms, and bond forms) are available from the Professional Engineering Consultants (PEC) Plan Room hosted by Central Bidding (CentralAuctionHouse/CentralBidding) subject to the site’s access/fee requirements.
Project consists of the reconnection of a historic side channel, improving the connectivity to the floodplain while increasing critical flood refuge and salmonid-rearing habitat along the cedar river. The project will also include partially removing an existing revetment and constructing a new revetment end treatment extending off the remaining upstream portion of the rutledge johnson facility that is being left in place. The work required to complete this project includes installing and maintaining temporary erosion and sediment control facilities; providing temporary traffic control; removing noxious weeds; clearing; removing trash and miscellaneous abandoned infrastructure from the site; tree salvage; installing and maintaining temporary facilities; excavation and haul; grading; riprap removal; soil decompaction and amendment; placing and anchoring large woody debris; installing vertical buried log piles and perch poles; and installing a riprap revetment end treatment.
Posted Date
Dec 5, 2025
Due Date
Jan 13, 2026
Release: Dec 5, 2025
Close:
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Project consists of the reconnection of a historic side channel, improving the connectivity to the floodplain while increasing critical flood refuge and salmonid-rearing habitat along the cedar river. The project will also include partially removing an existing revetment and constructing a new revetment end treatment extending off the remaining upstream portion of the rutledge johnson facility that is being left in place. The work required to complete this project includes installing and maintaining temporary erosion and sediment control facilities; providing temporary traffic control; removing noxious weeds; clearing; removing trash and miscellaneous abandoned infrastructure from the site; tree salvage; installing and maintaining temporary facilities; excavation and haul; grading; riprap removal; soil decompaction and amendment; placing and anchoring large woody debris; installing vertical buried log piles and perch poles; and installing a riprap revetment end treatment.
Available