Summary
Project consists of constructing a new 1-million-gal (MG) prestressed concrete circular reclaimed water reservoir. The Project includes approx. 350 LF of onsite piping; approx. 1,380 LF of potable water main extension, and construction of a new pump station. The pump station will include a prefabricated steel building to be furnished, fabricated, and delivered by the Contractor; installation of pumps, motors, valves, controls, instrumentation, mechanical and electrical systems; and a new electrical service. The reservoir will be supplied by existing 24" and 16" recycled water mains and will convey recycled water through the proposed pump station to the adjacent elevated tank serving the City's recycled water distribution system. A proposed 12" potable water main extension will serve as a backup supply to the reservoir. See outside link.