Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Includes al labor, materials and equipment to furnish and install approximately 21,600 LF of 12" pressure class 350 ductile iron water line, 100 LF of 6" ductile iron water line, reconnect 91 water services and all appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Installation of hdpe water line, fittings, valves, service connections, tie-ins, etc. Street rehabilitation including demolition/removals, hot-mix asphalt overlay, concrete paving, curb and gutter, fillets, sidewalk, valley gutters, traffic control and other appurtenances related to street construction.
Posted Date
Dec 12, 2025
Due Date
Jan 15, 2026
Release: Dec 12, 2025
Close: Jan 15, 2026
Installation of hdpe water line, fittings, valves, service connections, tie-ins, etc. Street rehabilitation including demolition/removals, hot-mix asphalt overlay, concrete paving, curb and gutter, fillets, sidewalk, valley gutters, traffic control and other appurtenances related to street construction.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx. 2,463 LF of 1" Dia. HDPE DR 11 Pipe, Including All HDD, 533 LF of 1.5" Dia. HDPE DR 11 Pipe, Including All HDD, Excavation; 338 LF of 2" Dia. HDPE DR 11 Pipe, Including All HDD; 131 LF of 2.5" Dia. HDPE DR 11 Pipe; 28 LF of 4" Dia. HDPE DR 11 Pipe, Including All HDD. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 8, 2026
Release: Dec 9, 2025
Close: Jan 8, 2026
Work includes approx. 2,463 LF of 1" Dia. HDPE DR 11 Pipe, Including All HDD, 533 LF of 1.5" Dia. HDPE DR 11 Pipe, Including All HDD, Excavation; 338 LF of 2" Dia. HDPE DR 11 Pipe, Including All HDD; 131 LF of 2.5" Dia. HDPE DR 11 Pipe; 28 LF of 4" Dia. HDPE DR 11 Pipe, Including All HDD. See outside link.
AvailableWork includes installation of approx 2,270 LF of 8" water line and 1,130 LF of 6" to replace the existing water line, installation of valves hydrants and all appurtenances and the abandonment of the existing water lines.
Posted Date
Nov 21, 2025
Due Date
Jan 8, 2026
Release: Nov 21, 2025
Close: Jan 8, 2026
Work includes installation of approx 2,270 LF of 8" water line and 1,130 LF of 6" to replace the existing water line, installation of valves hydrants and all appurtenances and the abandonment of the existing water lines.
AvailableProvide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →