Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Berwyn North School District 98 seeks bids for building improvements at the 16th St. Student Center, covering general trades, electric, HVAC, plumbing, fire protection, windows & glass, and acoustical ceiling tiles. Bidders must provide bid security and comply with Illinois public works laws.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Building 500 improvements.
Posted Date
Dec 10, 2025
Due Date
Jan 21, 2026
Release: Dec 10, 2025
Close: Jan 21, 2026
Building 500 improvements.
AvailableThe project consists of the removal and replacement of the condensing boilers serving the Event Center Building. (4) existing condensing boilers are to be removed and replaced with (3) 5000 MBH boilers and (1) 2000 MBH boiler. Existing boiler pumps, system pumps, expansion tanks, and air separators are to be removed and replaced. Temperature controls to be updated to serve this new equipment.
Posted Date
Jan 9, 2026
Due Date
Jan 29, 2026
Release: Jan 9, 2026
Close: Jan 29, 2026
The project consists of the removal and replacement of the condensing boilers serving the Event Center Building. (4) existing condensing boilers are to be removed and replaced with (3) 5000 MBH boilers and (1) 2000 MBH boiler. Existing boiler pumps, system pumps, expansion tanks, and air separators are to be removed and replaced. Temperature controls to be updated to serve this new equipment.
AvailableRequest for proposals for facilities improvements at the JFK Community Center located at 114 Hickory St. Buffalo, NY 14204.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
Request for proposals for facilities improvements at the JFK Community Center located at 114 Hickory St. Buffalo, NY 14204.
AvailableEngineering design services are sought for stormwater drainage and water quality improvements, including concept development, construction design, and permitting, for specific neighborhoods in St. Michaels and the Lower Choptank Watershed.
Posted Date
Dec 23, 2025
Due Date
Feb 4, 2026
Release: Dec 23, 2025
Close: Feb 4, 2026
Engineering design services are sought for stormwater drainage and water quality improvements, including concept development, construction design, and permitting, for specific neighborhoods in St. Michaels and the Lower Choptank Watershed.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis