Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Newark
Work includes 1 LS clearing and grubbing; 1 LS CCTV of sanitary and storm sewer; 1 LS temporary / bypass pumping; 1,443 CY filling, sealing, and abandonment of existing sewer; 10 EA abandonment of existing combined sewer manholes; 262 CY filling, sealing and abandonment of existing water pipe; 2,767 LF 8" PVC - sdr35; 533 VLF sanitary precast concrete manhole, additional depth; 50 CY sewer encasement; 2,884 LF sewer lateral reconnection; 388 EA sewer lateral cleanouts; 52 LF jack and bore location 2, 30" casing; 2,019 LF 12" HDPE - corrugated; 340 VF stormwater precast concrete manhole, additional depth; 7 EA precast concrete catch basin, 6' x 6'; 122 LF jack and bore location 1, at railroad with 60" casing.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of New Bedford
Project consists of sewer separation. See outside link.
Posted Date
Aug 21, 2025
Due Date
Nov 26, 2025
Release: Aug 21, 2025
City of New Bedford
Close: Nov 26, 2025
Project consists of sewer separation. See outside link.
AvailableCounty of Placer
Parkway phase 1 - construction project.
Posted Date
Oct 23, 2025
Due Date
Dec 16, 2025
Release: Oct 23, 2025
County of Placer
Close: Dec 16, 2025
Parkway phase 1 - construction project.
AvailableCity of Santa Ana
The City of Santa Ana Public Works seeks a qualified consultant to provide environmental revalidation, plans, specifications and estimates (PS&E), and right‑of‑way services for the Santa Ana Grade Separation Project. Proposals must be submitted electronically and by five sealed hard copies delivered to the Ross Annex drop box by the due date.
Posted Date
Nov 14, 2025
Due Date
Jan 14, 2026
Release: Nov 14, 2025
City of Santa Ana
Close: Jan 14, 2026
The City of Santa Ana Public Works seeks a qualified consultant to provide environmental revalidation, plans, specifications and estimates (PS&E), and right‑of‑way services for the Santa Ana Grade Separation Project. Proposals must be submitted electronically and by five sealed hard copies delivered to the Ross Annex drop box by the due date.
AvailableCity of Crystal Lake
Phase 1: Installation/relocation of all impacted underground utilities (storm sewer, sanitary sewer, water main), installation of the far upstream and downstream reinforced concrete box culverts (RCBC) and headwalls, Soil Erosion/Sediment Control measures, and all necessary restoration. Phase 2: Installation of the remaining proposed reinforced concrete box culverts (RCBC) and headwalls, proposed creek grading and appurtenances for stabilization, Soil Erosion/Sediment Control measures, and all necessary restoration.
Posted Date
Oct 13, 2025
Due Date
Nov 20, 2025
Release: Oct 13, 2025
City of Crystal Lake
Close: Nov 20, 2025
Phase 1: Installation/relocation of all impacted underground utilities (storm sewer, sanitary sewer, water main), installation of the far upstream and downstream reinforced concrete box culverts (RCBC) and headwalls, Soil Erosion/Sediment Control measures, and all necessary restoration. Phase 2: Installation of the remaining proposed reinforced concrete box culverts (RCBC) and headwalls, proposed creek grading and appurtenances for stabilization, Soil Erosion/Sediment Control measures, and all necessary restoration.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis