Summary
Provide north trail project. 1 LS mobilization; 3 EA grubbing; 2 EA salvage mail box support; 1 EA salvage hydrant; 2 ea salvage sign; 1 EA remove culvert end; 19 LF sawing concrete pavement (full depth); 231 LF sawing bituminous pavement (full depth); 115 LF remove curb & gutter; 48 SY remove concrete driveway pavement; 66 SY remove bituminous driveway pavement; 93 SY remove bituminous pavement; 146 SF remove concrete walk; 25 LF salvage landscape block; 10 SY remove landscaping; 1224 CY excavation - common (CV) (p); 925 CY common embankment (CY) (p); 130 CY rock excavation; 8 tn aggregate surfacing class 5; 12 hr street sweeper (with pickup broom); 28 SY bituminous patch special (street); 18 SY bituminous patch special (residential); 100 SY bituminous patch special (commercial). See attached file.