Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Illinois Department of Transportation (District 1) is soliciting bids for a 1.6-mile resurfacing and ADA improvement project on US 45 (FAP 330) in the Village of Frankfort and Frankfort Township, Will County. Work includes pavement patching, HMA milling and resurfacing with polymerized hot-mix asphalt binder and surface courses, curb and gutter, median removal/replacement, traffic signal/APS adjustments, and pavement markings. The contract is scheduled for the January 16, 2026 letting at 12:00 PM.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Independence, KS is seeking bids for pavement patching, curb and gutter patching, sidewalk replacement, and sidewalk ADA ramp replacement. The contract involves excavation, compacted granular stone, sawcutting, and cast-in-place concrete. Three contracts will be awarded for water/sewer, street department, and sidewalk repairs.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
The City of Independence, KS is seeking bids for pavement patching, curb and gutter patching, sidewalk replacement, and sidewalk ADA ramp replacement. The contract involves excavation, compacted granular stone, sawcutting, and cast-in-place concrete. Three contracts will be awarded for water/sewer, street department, and sidewalk repairs.
AvailableThe City of Independence, KS is seeking bids for pavement patching, curb and gutter patching, sidewalk replacement, and sidewalk ADA ramp replacement. The contract involves excavation, compacted granular stone, sawcutting, and cast-in-place concrete. Three contracts will be awarded for water/sewer, street department, and sidewalk repairs.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
The City of Independence, KS is seeking bids for pavement patching, curb and gutter patching, sidewalk replacement, and sidewalk ADA ramp replacement. The contract involves excavation, compacted granular stone, sawcutting, and cast-in-place concrete. Three contracts will be awarded for water/sewer, street department, and sidewalk repairs.
Work includes removals, grading, aggregate, concrete pavement, asphalt pavement, curb and gutter, concrete sidewalk, storm sewer, erosion control, permanent signing, traffic control, pavement marking, sanitary, water, restoration.
Posted Date
Dec 9, 2025
Due Date
Jan 13, 2026
Release: Dec 9, 2025
Close: Jan 13, 2026
Work includes removals, grading, aggregate, concrete pavement, asphalt pavement, curb and gutter, concrete sidewalk, storm sewer, erosion control, permanent signing, traffic control, pavement marking, sanitary, water, restoration.
AvailableIDOT is soliciting bids for HMA resurfacing of Maple Avenue in the Village of Brookfield (Cook County), from Brookfield Avenue to 31st Street. Work includes pavement patching, curb and gutter replacement, sidewalk and driveway apron replacement, ADA ramps, curb bump-outs, and installation of flashing beacons at a school crossing. The contract is scheduled for the January 16, 2026 letting and specifies 80 working days to complete the project.
Posted Date
Nov 17, 2025
Due Date
Jan 16, 2026
Close: Jan 16, 2026
IDOT is soliciting bids for HMA resurfacing of Maple Avenue in the Village of Brookfield (Cook County), from Brookfield Avenue to 31st Street. Work includes pavement patching, curb and gutter replacement, sidewalk and driveway apron replacement, ADA ramps, curb bump-outs, and installation of flashing beacons at a school crossing. The contract is scheduled for the January 16, 2026 letting and specifies 80 working days to complete the project.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis