Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking bids from firm(s) to provide construction services for the public works & utilities department. Construction of a City 12" water main with 24" casing crossing US 54. 1 LS site clearing; 1 LS site restoration; 1 LS seeding, temporary; 1 LS seeding; 1 LS remove reset 36" RCP; 2,737 LF 12" PVC pipe; 20 LF 12" DICL pipe; 238 LF 12" directional drill RJ pipe; 310 LF 12" RJ pipe w/24" steel casing-boring & jacking; 46 LF 16" PVC pipe; 20 LF 16" DICL pipe; 8" MJ gate valve; 3 EA 12" MJ butterfly valve; 2 EA 12" MJ anchor butterfly valve, special; 3 EA 1" air release assembly; 1 EA blowoff valve, assembly; 52 LF sand backfill, flush & vibrate; 5 LF fire hydrant assembly; 20 LF remove & replace concrete drive; 31 LF remove & replace concrete sidewalk; 200 LF remove & replace chain-link fence; traffic control.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This project includes replacing 374 feet of existing waterline with 16" ductile iron waterline in a 26" steel casing under us 30/250.
Posted Date
Dec 23, 2025
Due Date
Jan 22, 2026
Release: Dec 23, 2025
Close: Jan 22, 2026
This project includes replacing 374 feet of existing waterline with 16" ductile iron waterline in a 26" steel casing under us 30/250.
AvailableWork includes extension of 12" off-site waterline.
Posted Date
Dec 16, 2025
Due Date
Jan 15, 2026
Release: Dec 16, 2025
Close: Jan 15, 2026
Work includes extension of 12" off-site waterline.
AvailableThe Community Redevelopment Agency (CRA) and the City of Orlando are soliciting proposals for a bold and visionary partner. They seek to reimagine and activate the 54 W. Church Street arts space. This location was formerly home to the Mad Cow Theatre and the Fringe Arts Space.
Posted Date
Jan 3, 2026
Due Date
Feb 19, 2026
Release: Jan 3, 2026
Close: Feb 19, 2026
The Community Redevelopment Agency (CRA) and the City of Orlando are soliciting proposals for a bold and visionary partner. They seek to reimagine and activate the 54 W. Church Street arts space. This location was formerly home to the Mad Cow Theatre and the Fringe Arts Space.
AvailableWork includes waterline replacement
Posted Date
-
Due Date
Jan 16, 2026
Release: -
Close: Jan 16, 2026
Work includes waterline replacement
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis