Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of wastewater pump station services. Work includes 2" SCH 40 PVC drainage pipe from the valve vault to the wet well; construct a below grade 4’x4’ I.D. precast concrete valve vault adjacent to the existing wet well; electrical wiring, conduits and associated components. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Pacific Grove requests sealed bids for wastewater pump station services for the 15.5 Crespi Pond Pump Station, performed per the project plans and specifications. This is a public works contract requiring contractor/subcontractor registration with the California Department of Industrial Relations and payment of Monterey County prevailing wages; award to the lowest responsible bidder.
Posted Date
Dec 3, 2025
Due Date
Jan 22, 2026
Release: Dec 3, 2025
Close: Jan 22, 2026
The City of Pacific Grove requests sealed bids for wastewater pump station services for the 15.5 Crespi Pond Pump Station, performed per the project plans and specifications. This is a public works contract requiring contractor/subcontractor registration with the California Department of Industrial Relations and payment of Monterey County prevailing wages; award to the lowest responsible bidder.
Premium
Access the largest public sector contact database
Replacement of existing station pumps, valves, piping, exterior door and cable hoists at pump stations 5, 14, and 38. Electrical upgrades, including building modifications, site lighting, and transfer switches at pump stations 14 and 38. Replacement of miscellaneous metals, piping, and valves at pump station 53. 4.Installation of corrosion control equipment at pump stations 53 and 57.
Posted Date
Nov 19, 2025
Due Date
Jan 8, 2026
Release: Nov 19, 2025
Close: Jan 8, 2026
Replacement of existing station pumps, valves, piping, exterior door and cable hoists at pump stations 5, 14, and 38. Electrical upgrades, including building modifications, site lighting, and transfer switches at pump stations 14 and 38. Replacement of miscellaneous metals, piping, and valves at pump station 53. 4.Installation of corrosion control equipment at pump stations 53 and 57.
AvailableEquipment covered by this bid includes the manufacture, delivery and start-up services for the Poquito Pump Station Replacement - Pump Station and Controls (Equipment Only).
Posted Date
Dec 8, 2025
Due Date
Jan 7, 2026
Release: Dec 8, 2025
Close: Jan 7, 2026
Equipment covered by this bid includes the manufacture, delivery and start-up services for the Poquito Pump Station Replacement - Pump Station and Controls (Equipment Only).
AvailableRecoat degraded concrete within the wet well and replacement of pumps and discharge piping, remove the exiting fiberglass pump station structure and replace with a new quadplex grinder packaged pump, remove the exiting concrete pump station structures and replace with a new precast concrete duplex submersible pump station.
Posted Date
Nov 17, 2025
Due Date
Dec 17, 2025
Release: Nov 17, 2025
Close: Dec 17, 2025
Recoat degraded concrete within the wet well and replacement of pumps and discharge piping, remove the exiting fiberglass pump station structure and replace with a new quadplex grinder packaged pump, remove the exiting concrete pump station structures and replace with a new precast concrete duplex submersible pump station.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis