Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes pipe crossings.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project seeks a contractor to remove and replace brick and granite pavers at Downtown Mall Crossings, including associated civil elements. Scope includes installation of a custom drop inlet, concrete pipe, curb, and sidewalk.
Posted Date
Dec 4, 2025
Due Date
Jan 9, 2026
Release: Dec 4, 2025
Close: Jan 9, 2026
The project seeks a contractor to remove and replace brick and granite pavers at Downtown Mall Crossings, including associated civil elements. Scope includes installation of a custom drop inlet, concrete pipe, curb, and sidewalk.
AvailablePremium
Access the largest public sector contact database
Installation of a traffic signal, grading, curb and gutter, HMA patching, storm sewer and intakes, sidewalks, driveways, pavement markings, signage, erosion control.
Posted Date
Dec 1, 2025
Due Date
Dec 18, 2025
Release: Dec 1, 2025
Close: Dec 18, 2025
Installation of a traffic signal, grading, curb and gutter, HMA patching, storm sewer and intakes, sidewalks, driveways, pavement markings, signage, erosion control.
AvailableSale of approx. 42 acres of real property.
Posted Date
Aug 26, 2025
Due Date
Feb 20, 2026
Release: Aug 26, 2025
Close: Feb 20, 2026
Sale of approx. 42 acres of real property.
AvailableWork includes 54 EA inlet protection system; 1 LS clearing and grubbing; 8731.3 CY regular excavation; 143. 7 CY embankment; 18,967 CY type b stabilization; 980 SY optional base, base group 04; 15,380 SY optional base, base group 06; 1,746 TN superpave asphaltic concrete, traffic c, pg76-22; 846 tn asphalt concrete friction course,traffic c, fc-9. 5, pg 76-22; 22 EA inlets, curb, type 9; 22 eainlets, dt bot, type c,<10'; 8 eainlets, dt bot, type f,<10'; 22 EA manholes, p-7, <10'; 19 EA manhole, adjust, utilities; 18 EA valve boxes, adjust; 3 EA meter boxes, adjust; 1,528 LF pipe culvert,optional material,round, 18"s/cd. See outside link.
Posted Date
Nov 30, 2025
Due Date
Jan 15, 2026
Release: Nov 30, 2025
Close: Jan 15, 2026
Work includes 54 EA inlet protection system; 1 LS clearing and grubbing; 8731.3 CY regular excavation; 143. 7 CY embankment; 18,967 CY type b stabilization; 980 SY optional base, base group 04; 15,380 SY optional base, base group 06; 1,746 TN superpave asphaltic concrete, traffic c, pg76-22; 846 tn asphalt concrete friction course,traffic c, fc-9. 5, pg 76-22; 22 EA inlets, curb, type 9; 22 eainlets, dt bot, type c,<10'; 8 eainlets, dt bot, type f,<10'; 22 EA manholes, p-7, <10'; 19 EA manhole, adjust, utilities; 18 EA valve boxes, adjust; 3 EA meter boxes, adjust; 1,528 LF pipe culvert,optional material,round, 18"s/cd. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis