Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Approx. 950 LF of 6", 3,350 LF of 8", and 20 LF of 12" diameter restrained joint water main replacement and 8 connections to the existing water system. The work also includes replacement of 97 water services, 7 fire hydrants, 7 blowoff assemblies, and 1 air and vacuum relief valve (ARV) assembly. Existing water main and appurtenances shall be filled and abandoned in place. Restoration includes trench patching, asphalt grind & overlay, curb, sidewalk & 35 ADA ramp replacements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: -
Close: Feb 5, 2026
Avenue improvements and water main.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 7,595 LF 8" DIP class 52 with polyethylene wrap water main; 300 LF 8" DIP class 52 with polyethylene wrap water main by directional bore; 2,640 LF 1" PEX water service pipe by directional bore; 10 EA 6" PVC SDR-26 D2241 sanitary sewer service repair. See outside link.
Posted Date
Dec 22, 2025
Due Date
Feb 9, 2026
Release: Dec 22, 2025
Close: Feb 9, 2026
Work includes approx 7,595 LF 8" DIP class 52 with polyethylene wrap water main; 300 LF 8" DIP class 52 with polyethylene wrap water main by directional bore; 2,640 LF 1" PEX water service pipe by directional bore; 10 EA 6" PVC SDR-26 D2241 sanitary sewer service repair. See outside link.
AvailableThe Village of Gurnee, Illinois is soliciting sealed bids for the Estes Region Water Main Improvements, including installation of approximately 6,720 feet of 6‑inch and 2,770 feet of 8‑inch PVC water main, valves, hydrants, service connections, and related storm sewer and restoration work. Bids will be accepted only from contractors pre‑qualified by the Owner and meeting IDOT drainage pre‑qualification; bid documents will be distributed via the Village’s LiquidFiles FTP upon pre‑qualification. Sealed bids are due by 10:30 AM on February 9, 2026, at the Village’s Engineering office.
Posted Date
Jan 5, 2026
Due Date
Feb 9, 2026
Release: Jan 5, 2026
Close: Feb 9, 2026
The Village of Gurnee, Illinois is soliciting sealed bids for the Estes Region Water Main Improvements, including installation of approximately 6,720 feet of 6‑inch and 2,770 feet of 8‑inch PVC water main, valves, hydrants, service connections, and related storm sewer and restoration work. Bids will be accepted only from contractors pre‑qualified by the Owner and meeting IDOT drainage pre‑qualification; bid documents will be distributed via the Village’s LiquidFiles FTP upon pre‑qualification. Sealed bids are due by 10:30 AM on February 9, 2026, at the Village’s Engineering office.
AvailableWork includes 3,245 LF furnish and install pvc water main (open cut), 8" pvc; 1 EA furnish and install tapping sleeve with tapping valve and valve box , 6" x 6"; 1 EA furnish and install tapping sleeve with tapping valve and valve box , 8" x 8"; 7 EA furnish and install gate valve and valve box, 8"; 1 ea furnish and install line stops, 8"; 1 EA furnish and install line stops, 6"; 1 EA furnish and install line stops, 2"; 1 EA furnish and install ductile iron pipe fittings for water main, 2" sleeve; 1 EA furnish and install ductile iron pipe fittings for water main, 2" plug; 1 EA furnish and install ductile iron pipe fittings for water main, 6" plug. See outside link.
Posted Date
Jan 15, 2026
Due Date
Feb 12, 2026
Release: Jan 15, 2026
Close: Feb 12, 2026
Work includes 3,245 LF furnish and install pvc water main (open cut), 8" pvc; 1 EA furnish and install tapping sleeve with tapping valve and valve box , 6" x 6"; 1 EA furnish and install tapping sleeve with tapping valve and valve box , 8" x 8"; 7 EA furnish and install gate valve and valve box, 8"; 1 ea furnish and install line stops, 8"; 1 EA furnish and install line stops, 6"; 1 EA furnish and install line stops, 2"; 1 EA furnish and install ductile iron pipe fittings for water main, 2" sleeve; 1 EA furnish and install ductile iron pipe fittings for water main, 2" plug; 1 EA furnish and install ductile iron pipe fittings for water main, 6" plug. See outside link.