Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
15.42 mi of concrete pavement repairs, resealing concrete joints, chip seal and seal fog the shoulders.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 1,642 GAL bituminous material for fog seal; 13,680 SY bituminous seal coat; 4,378 GAL bituminous material for seal coat; 9,224 LF interim pavement marking; 4,612 LF 4" double solid line multi-component; 16 LF protect pavement markings; 27,232 SY bituminous seal coat; 12,787 LF interim pavement marking; 266 LF 24" solid line multi-component; 12 LF protect pavement markings; 6,438 SY bituminous seal coat; 50,487 SY bituminous seal coat; 37,456 LF interim pavement marking.
Posted Date
Dec 19, 2025
Due Date
Jan 15, 2026
Release: Dec 19, 2025
Close: Jan 15, 2026
Work includes 1,642 GAL bituminous material for fog seal; 13,680 SY bituminous seal coat; 4,378 GAL bituminous material for seal coat; 9,224 LF interim pavement marking; 4,612 LF 4" double solid line multi-component; 16 LF protect pavement markings; 27,232 SY bituminous seal coat; 12,787 LF interim pavement marking; 266 LF 24" solid line multi-component; 12 LF protect pavement markings; 6,438 SY bituminous seal coat; 50,487 SY bituminous seal coat; 37,456 LF interim pavement marking.
AvailableWork includes 70,604 SY cape seal; 160 SY hot-mix asphalt surface removal - butt joint; 15 cal da. Changeable message sign; 7,943' short term pavement marking; 2,648 SF short term pavement marking removal; 57,523' modified urethane pavement marking - line 5"; 333 EA. Raised reflective pavement marker.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
Work includes 70,604 SY cape seal; 160 SY hot-mix asphalt surface removal - butt joint; 15 cal da. Changeable message sign; 7,943' short term pavement marking; 2,648 SF short term pavement marking removal; 57,523' modified urethane pavement marking - line 5"; 333 EA. Raised reflective pavement marker.
AvailableThe City of Sunset Hills, Missouri is soliciting bids for the 2026 Joint Seal of Concrete Streets, focusing on Ward 3 to seal pavement joints and cracks to prevent water infiltration. Bid documents are provided through the Drexel Technologies Plan Room as referenced by the city's official project page. Bids are due January 27, 2026; this is a public works construction solicitation, not a grant program.
Posted Date
-
Due Date
Jan 27, 2026
Release: -
Close: Jan 27, 2026
The City of Sunset Hills, Missouri is soliciting bids for the 2026 Joint Seal of Concrete Streets, focusing on Ward 3 to seal pavement joints and cracks to prevent water infiltration. Bid documents are provided through the Drexel Technologies Plan Room as referenced by the city's official project page. Bids are due January 27, 2026; this is a public works construction solicitation, not a grant program.
AvailableApprox. 778 ft Short term pavement marking; 63 SF paint pavement marking - letters and symbols; 69 ft paint pavement marking - line 24"; 8,734 P bituminous materials (fog seal). See outside link.
Posted Date
-
Due Date
Jan 16, 2026
Release: -
Close: Jan 16, 2026
Approx. 778 ft Short term pavement marking; 63 SF paint pavement marking - letters and symbols; 69 ft paint pavement marking - line 24"; 8,734 P bituminous materials (fog seal). See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis