Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Consists of diamond grind of the existing PCCP, resealing PCCP pavement joints, pavement markings, and other related work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The proposed work consists of shifting the northbound and southbound roadways and associated ramps to the outside, shifting eastbound roadway and the associated ramps near the system traffic interchange outside, and constructing a new direct high occupancy vehicle ((DHOV)) ramp roadway and bridge, constructing two new bridges for a new connection, retaining walls, drainage, signing, pavement marking, lighting, landscaping, and other related work; Also includes 1,247 LF of removal of concrete curb; 54 CY of drainage excavation, 139 LF of jacking, boring or tunneling pipe; see attached files.
Posted Date
Jun 25, 2025
Due Date
Jan 30, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 30, 2026
The proposed work consists of shifting the northbound and southbound roadways and associated ramps to the outside, shifting eastbound roadway and the associated ramps near the system traffic interchange outside, and constructing a new direct high occupancy vehicle ((DHOV)) ramp roadway and bridge, constructing two new bridges for a new connection, retaining walls, drainage, signing, pavement marking, lighting, landscaping, and other related work; Also includes 1,247 LF of removal of concrete curb; 54 CY of drainage excavation, 139 LF of jacking, boring or tunneling pipe; see attached files.
AvailableHennepin County is soliciting professional engineering services for the CSAH 101 (Wayzata Blvd) reconstruction project, including preliminary design and engineering. The solicitation is listed as Event ID PFP0000513 with an estimated value range of approximately $500,000$2,000,000 and is categorized as a professional services procurement (RFP). The event was posted on 2026-01-07 and proposals are due 2026-02-04 at 12:00 PM CST.
Posted Date
Jan 7, 2026
Due Date
Feb 4, 2026
Release: Jan 7, 2026
Close: Feb 4, 2026
Hennepin County is soliciting professional engineering services for the CSAH 101 (Wayzata Blvd) reconstruction project, including preliminary design and engineering. The solicitation is listed as Event ID PFP0000513 with an estimated value range of approximately $500,000$2,000,000 and is categorized as a professional services procurement (RFP). The event was posted on 2026-01-07 and proposals are due 2026-02-04 at 12:00 PM CST.
AvailableWork consists of restriping the crosswalks, installation of signs, and other related work. Work includes, 1,673 LF of waterborne-type ii pavement marking (painted) (white); 459 LF of obliterate pavement marking (stripe); 35 LF of miscellaneous work (repaint curb); 11 LF of sign post (perforated) (2 s). See attached files.
Posted Date
Nov 6, 2025
Due Date
Jan 30, 2026
Release: Nov 6, 2025
Close: Jan 30, 2026
Work consists of restriping the crosswalks, installation of signs, and other related work. Work includes, 1,673 LF of waterborne-type ii pavement marking (painted) (white); 459 LF of obliterate pavement marking (stripe); 35 LF of miscellaneous work (repaint curb); 11 LF of sign post (perforated) (2 s). See attached files.
AvailableSeeking proposals from qualified firms to provide ongoing engineering analysis and advice regarding the gas distribution system engineering and planning practices of regulated gas distribution utilities.
Posted Date
Dec 22, 2025
Due Date
Feb 3, 2026
Release: Dec 22, 2025
Close: Feb 3, 2026
Seeking proposals from qualified firms to provide ongoing engineering analysis and advice regarding the gas distribution system engineering and planning practices of regulated gas distribution utilities.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →