Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Approx. 14 CAL DA Changeable message sign; 1 LS containment and disposal of lead paint cleaning residues no. 1; 1 LS cleaning and painting steel bridge no. 1; 1 LS cleaning and painting steel bridge no. 2. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes bridge painting.
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
Work includes bridge painting.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 16 EA. temporary rumble strips; 42 CAL da. Changeable message sign; 2,550' relocate temporary concrete barrier; 2 EA. Impact attenuators, temporary (non- redirective), test level 2; 6 EA. Impact attenuators, temporary (non- redirective), test level 3; 2 ea. Impact attenuators, relocate (non- redirective), test level 2; 1 ls containment and disposal of lead paint cleaning residues no. 1; 1 ls containment and disposal of lead paint cleaning residues no. 2; 1 ls cleaning and painting steel bridge no. 1; 1 ls cleaning and painting steel bridge no. 2.
Posted Date
-
Due Date
Jan 16, 2026
Release: -
Close: Jan 16, 2026
Work includes 16 EA. temporary rumble strips; 42 CAL da. Changeable message sign; 2,550' relocate temporary concrete barrier; 2 EA. Impact attenuators, temporary (non- redirective), test level 2; 6 EA. Impact attenuators, temporary (non- redirective), test level 3; 2 ea. Impact attenuators, relocate (non- redirective), test level 2; 1 ls containment and disposal of lead paint cleaning residues no. 1; 1 ls containment and disposal of lead paint cleaning residues no. 2; 1 ls cleaning and painting steel bridge no. 1; 1 ls cleaning and painting steel bridge no. 2.
AvailableApprox. 150 ft modified urethane pavement marking - line 6"; 1 LS containment and disposal of non-lead paint cleaning residues no. 1; 1 LS cleaning and painting steel bridge no. 1. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
Approx. 150 ft modified urethane pavement marking - line 6"; 1 LS containment and disposal of non-lead paint cleaning residues no. 1; 1 LS cleaning and painting steel bridge no. 1. See outside link.
AvailableThe Illinois Department of Transportation is soliciting bids for bridge painting and repair of structure SN 063-0002 (Scott W. Lucas Memorial Bridge) over the Illinois River in Fulton County. The solicitation is part of the January 16, 2026 letting and includes requirements for SSPC-QP1 and QP2 certified contractors, with a completion date of September 1, 2027 plus 10 working days. Plans and special provisions have not yet been posted at the time of this notice.
Posted Date
Nov 18, 2025
Due Date
Jan 16, 2026
Release: Nov 18, 2025
Close: Jan 16, 2026
The Illinois Department of Transportation is soliciting bids for bridge painting and repair of structure SN 063-0002 (Scott W. Lucas Memorial Bridge) over the Illinois River in Fulton County. The solicitation is part of the January 16, 2026 letting and includes requirements for SSPC-QP1 and QP2 certified contractors, with a completion date of September 1, 2027 plus 10 working days. Plans and special provisions have not yet been posted at the time of this notice.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →