Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This Request for Proposals (RFP) 07-ITB-25 is for a civil project in Palm Bay, Florida, focusing on culvert pipe replacement. The project involves the removal, disposal, re-installation, and restoration of street crossings within Port Malabar Units 10, 12, and 16 at multiple pipe locations. Bidders are directed to the City of Palm Bay's Bonfirehub portal for full solicitation documents.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Spokane County is soliciting bids for sidewalk repair and replacement work along West Broadway Avenue, with construction scheduled for spring 2026. The county issued Invitation to Bid ITB #25-7022 and is seeking qualified contractors to provide labor, materials, equipment, permitting and coordination; bids are due Dec 22, 2025.
Posted Date
Dec 1, 2025
Due Date
Dec 22, 2025
Release: Dec 1, 2025
Close: Dec 22, 2025
Spokane County is soliciting bids for sidewalk repair and replacement work along West Broadway Avenue, with construction scheduled for spring 2026. The county issued Invitation to Bid ITB #25-7022 and is seeking qualified contractors to provide labor, materials, equipment, permitting and coordination; bids are due Dec 22, 2025.
Premium
Access the largest public sector contact database
Furnish 2-2/3" x 1/2" and 3" x 1" corrugated riveted or spiral galvanized steel, aluminum, and aluminum coated culvert pipe and also provide solid and perforated plastic pipe. All collars will be 2 feet in length. Nuts and long bolts will be provided with the collars. Specifications as follows: (1) 14 gage. 079" (2) 12 gage. 109" (3) 10 gage. 138" 12" through 48" inclusive, to include span and rise culverts. Plastic pipe 8" through 48".
Posted Date
Dec 10, 2025
Due Date
Jan 5, 2026
Release: Dec 10, 2025
Close: Jan 5, 2026
Furnish 2-2/3" x 1/2" and 3" x 1" corrugated riveted or spiral galvanized steel, aluminum, and aluminum coated culvert pipe and also provide solid and perforated plastic pipe. All collars will be 2 feet in length. Nuts and long bolts will be provided with the collars. Specifications as follows: (1) 14 gage. 079" (2) 12 gage. 109" (3) 10 gage. 138" 12" through 48" inclusive, to include span and rise culverts. Plastic pipe 8" through 48".
AvailableReplace holcomb blvd culvert pipe.
Posted Date
Dec 15, 2025
Due Date
Jan 7, 2026
Release: Dec 15, 2025
Close: Jan 7, 2026
Replace holcomb blvd culvert pipe.
AvailableReplacement of a culvert, approx. 650 LF. The existing box culvert will be replaced with a new, polymer-coated pipe arch structure. Additional work consists of watermain replacement and roadway approach reconstruction. An off-site detour will be utilized for the duration of construction.
Posted Date
Dec 12, 2025
Due Date
Jan 6, 2026
Release: Dec 12, 2025
Close: Jan 6, 2026
Replacement of a culvert, approx. 650 LF. The existing box culvert will be replaced with a new, polymer-coated pipe arch structure. Additional work consists of watermain replacement and roadway approach reconstruction. An off-site detour will be utilized for the duration of construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis