Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
53 CY roadway excavation; 71 CY wood mulch; check and test existing irrigation facilities; 14 LF (f) - pvc pipe conduit (sleeve); 77 CY class 3 aggregate base (cy); 77 ton hot mix asphalt (type a).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Supply of tms module / shaft to engine components: spline adapter and splined hub, if necessary. Tms plumbing tms calibration kit with weights electronics: signal processor, rotastat control and 90 ft. Cable.
Posted Date
Nov 17, 2025
Due Date
Dec 2, 2026
Release: Nov 17, 2025
Close: Dec 2, 2026
Supply of tms module / shaft to engine components: spline adapter and splined hub, if necessary. Tms plumbing tms calibration kit with weights electronics: signal processor, rotastat control and 90 ft. Cable.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Repair/repair and modify fuel management panels.
Posted Date
Sep 3, 2025
Due Date
Jan 15, 2026
Release: Sep 3, 2025
Close: Jan 15, 2026
Repair/repair and modify fuel management panels.
AvailableProvide grading, bituminous milling and surfacing, ADA improvements, roundabouts, TMS, signals, signing, lighting.
Posted Date
Jan 2, 2026
Due Date
Jan 28, 2026
Release: Jan 2, 2026
Close: Jan 28, 2026
Provide grading, bituminous milling and surfacing, ADA improvements, roundabouts, TMS, signals, signing, lighting.
AvailablePrune existing plants; maintain existing planted areas; 390 CY wood mulch; 372 lb (f) - structural steel; 210 ea pavement marker (retroreflective).
Posted Date
Nov 10, 2025
Due Date
Jan 13, 2026
Release: Nov 10, 2025
Close: Jan 13, 2026
Prune existing plants; maintain existing planted areas; 390 CY wood mulch; 372 lb (f) - structural steel; 210 ea pavement marker (retroreflective).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →