Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Yates County Soil & Water Conservation District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Yates County Soil & Water Conservation District
Prepare a preliminary engineering report of suitable detail and completeness that would inform the District and associated stakeholders as to technical feasibility, cost, social and cultural implications and regulatory constraints.
Posted Date
Aug 7, 2025
Due Date
Sep 8, 2025
Release: Aug 7, 2025
Yates County Soil & Water Conservation District
Close: Sep 8, 2025
Prepare a preliminary engineering report of suitable detail and completeness that would inform the District and associated stakeholders as to technical feasibility, cost, social and cultural implications and regulatory constraints.
Yates County Soil & Water Conservation District
Provide installation of 1,530' of stream stabilization. This will include full length installation of stone, approx 12 stone cross vanes, and site stabilization post construction. This project will need to be constructed in 2024 assuming dry stream bed conditions exist at time of installation.
Posted Date
Aug 27, 2024
Due Date
Sep 20, 2024
Release: Aug 27, 2024
Yates County Soil & Water Conservation District
Close: Sep 20, 2024
Provide installation of 1,530' of stream stabilization. This will include full length installation of stone, approx 12 stone cross vanes, and site stabilization post construction. This project will need to be constructed in 2024 assuming dry stream bed conditions exist at time of installation.
Yates County Soil & Water Conservation District
Provide installation of 600' of stream stabilization. This will include full length installation of stone and four stone cross vanes. This project will need to be constructed in 2024 assuming dry stream bed conditions exist at time of installation.
Posted Date
Aug 27, 2024
Due Date
Sep 20, 2024
Release: Aug 27, 2024
Yates County Soil & Water Conservation District
Close: Sep 20, 2024
Provide installation of 600' of stream stabilization. This will include full length installation of stone and four stone cross vanes. This project will need to be constructed in 2024 assuming dry stream bed conditions exist at time of installation.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.