Learn more →Bridge rehabilitation (4 Structures) and bridge deck and rail repair (1 Structure); Involving installing sheet piles, repairing bridge deck, placing structural concrete, approach slabs, asphalt pavement, and bridge deck overlay, and installing expansion joint material and guardrail.
Posted Date
Dec 10, 2025
Due Date
Jan 8, 2026
Release: Dec 10, 2025
Close: Jan 8, 2026
Bridge rehabilitation (4 Structures) and bridge deck and rail repair (1 Structure); Involving installing sheet piles, repairing bridge deck, placing structural concrete, approach slabs, asphalt pavement, and bridge deck overlay, and installing expansion joint material and guardrail.
AvailableWork includes approx. 61,800 SY of Milling Plant Mix; 39,070 CY of Unclassified Excavation; 500 SF of Thermoplastic Pavement Markings; 360 LF of Sign Post, Wood 6x6 in; 40 EA of Flexible Delineators; 84 SF of Pavement Marking Removal. See outside link.
Posted Date
Dec 10, 2025
Due Date
Jan 8, 2026
Release: Dec 10, 2025
Close: Jan 8, 2026
Work includes approx. 61,800 SY of Milling Plant Mix; 39,070 CY of Unclassified Excavation; 500 SF of Thermoplastic Pavement Markings; 360 LF of Sign Post, Wood 6x6 in; 40 EA of Flexible Delineators; 84 SF of Pavement Marking Removal. See outside link.
AvailableMill, level and overlay, chip seal and rumble strips; Involving milling asphalt pavement, placing asphalt pavement and chip seal, installing stormwater control components, and fence.
Posted Date
Dec 10, 2025
Due Date
Jan 8, 2026
Release: Dec 10, 2025
Close: Jan 8, 2026
Mill, level and overlay, chip seal and rumble strips; Involving milling asphalt pavement, placing asphalt pavement and chip seal, installing stormwater control components, and fence.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis