Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Wood County Port Authority
Provide design-build services for the road design build roundabout. Work includes roadway construction, drainage, utilities, and site restoration.
Posted Date
Feb 13, 2026
Due Date
Mar 6, 2026
Release: Feb 13, 2026
Wood County Port Authority
Close: Mar 6, 2026
Provide design-build services for the road design build roundabout. Work includes roadway construction, drainage, utilities, and site restoration.
AvailableWood County Port Authority
Work includes constructing a 16-LF-wide multi-use path that is 0.6 miles long, extending from river road to the wood county park district's ww knight nature preserve. A 10-LF-wide path connects the trail to the nature preserve.
Posted Date
May 14, 2025
Due Date
Jun 6, 2025
Release: May 14, 2025
Wood County Port Authority
Close: Jun 6, 2025
Work includes constructing a 16-LF-wide multi-use path that is 0.6 miles long, extending from river road to the wood county park district's ww knight nature preserve. A 10-LF-wide path connects the trail to the nature preserve.
Wood County Port Authority
Work includes 1,800 CY excavation; 3,778 SY pavement planing, asphalt concrete; 42 SY tied concrete block mat with type 1 underlayment; 1,473 CY topsoil; 13,270 SY seeding and mulching; 30 MSF mowing; 3,131 LF 6" unclassified pipe underdrains; 10 LF 15" conduit, type c; 2 EA manhole; 2 EA manhole adjusted to grade; 1,885 CY asphalt concrete base; 2,240 CY aggregate base; 1,692 GAL tack coat; 7 CY asphalt concrete surface course; 10 cy asphalt concrete intermediate course; 3,135 LF combination curb and gutter; 1,725 LF underground warning/marking tape; 243 SF sign, flat sheet; 162 LF transverse/diagonal line, type 1.
Posted Date
Mar 19, 2025
Due Date
Apr 4, 2025
Release: Mar 19, 2025
Wood County Port Authority
Close: Apr 4, 2025
Work includes 1,800 CY excavation; 3,778 SY pavement planing, asphalt concrete; 42 SY tied concrete block mat with type 1 underlayment; 1,473 CY topsoil; 13,270 SY seeding and mulching; 30 MSF mowing; 3,131 LF 6" unclassified pipe underdrains; 10 LF 15" conduit, type c; 2 EA manhole; 2 EA manhole adjusted to grade; 1,885 CY asphalt concrete base; 2,240 CY aggregate base; 1,692 GAL tack coat; 7 CY asphalt concrete surface course; 10 cy asphalt concrete intermediate course; 3,135 LF combination curb and gutter; 1,725 LF underground warning/marking tape; 243 SF sign, flat sheet; 162 LF transverse/diagonal line, type 1.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Wood County Port Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Wood County Port Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database