Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Williamsport Municipal Water Authority
Installation of approx. 13,660 LF of 8" through 24" ductile iron water main at various locations in the City
Posted Date
Mar 6, 2026
Due Date
Apr 2, 2026
Release: Mar 6, 2026
Williamsport Municipal Water Authority
Close: Apr 2, 2026
Installation of approx. 13,660 LF of 8" through 24" ductile iron water main at various locations in the City
Williamsport Municipal Water Authority
Demolition of the existing medium voltage switch, PPL metering, and overhead line. Installation of new utility poles, a medium voltage switch, and PPL metering with medium voltage cabling.
Posted Date
Feb 26, 2026
Due Date
Mar 31, 2026
Release: Feb 26, 2026
Williamsport Municipal Water Authority
Close: Mar 31, 2026
Demolition of the existing medium voltage switch, PPL metering, and overhead line. Installation of new utility poles, a medium voltage switch, and PPL metering with medium voltage cabling.
Williamsport Municipal Water Authority
Work includes minor demolition; brick repointing and replacement; carpentry work, wood studs and wood moulding; batt insulation, joint sealants; aluminum entrances and door hardware, windows, solar window film, glass and glazing; gypsum board, floor, wall and ceiling finishes; interior signage, fire extinguishers and cabinets; solid surface windowsills and wall cap; HVAC work; and electrical work.
Posted Date
Nov 7, 2025
Due Date
Dec 3, 2025
Release: Nov 7, 2025
Williamsport Municipal Water Authority
Close: Dec 3, 2025
Work includes minor demolition; brick repointing and replacement; carpentry work, wood studs and wood moulding; batt insulation, joint sealants; aluminum entrances and door hardware, windows, solar window film, glass and glazing; gypsum board, floor, wall and ceiling finishes; interior signage, fire extinguishers and cabinets; solid surface windowsills and wall cap; HVAC work; and electrical work.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Williamsport Municipal Water Authority
The Planning and Operations Committee meeting agenda included the Executive Director's report and an engineering report from HRG. Key staff recommendations discussed were the bid award recommendations for the Mosquito Valley WTP Electrical Service Upgrade Project, the FY26 Water Main Replacement Projects, and the 2026 Pavement Restoration. Additional items included the NDWD permit issuance for Arxada and a discussion on the privatization moratorium letter.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Williamsport Municipal Water Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge