2026 Water Plant Rehabilitation - Westador Municipal Utility District RFP
Posted
Oct 29, 2026
Nov 14, 2026
Work includes blasting and recoating the entire interior of ground storage tank no. 1; seal welding patches on the ground storage tank no. 1 floor, walls, roof as needed, as encountered after surface preparation and as directed by the engineer; miscellaneous weld repairs, gusset plate connection repair/replacement and partial rafter replacements as needed, encountered after surface preparation of ground storage tank, removing and replacing the interior water fill line inside ground storage tank no. 1 including supports and any other accessories; partial replacement of ground storage tank no. 1 roof hatch curb and other miscellaneous metal repairs.



