Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
West Elizabeth Sanitary Authority
Administration Building Solar Panel and Roof Replacement Project includes the installation of solar panels for the Authority’s Administration building approx. 3,200 SF roof area). Work includes design, fabrication, delivery, and installation of roof top Photovoltaic Electric generating system with an approximate solar capacity of 24.99kW as well as removal and replacement of existing .060 White EPDM roof.
Posted Date
Mar 11, 2026
Due Date
Mar 23, 2026
Release: Mar 11, 2026
West Elizabeth Sanitary Authority
Close: Mar 23, 2026
Administration Building Solar Panel and Roof Replacement Project includes the installation of solar panels for the Authority’s Administration building approx. 3,200 SF roof area). Work includes design, fabrication, delivery, and installation of roof top Photovoltaic Electric generating system with an approximate solar capacity of 24.99kW as well as removal and replacement of existing .060 White EPDM roof.
AvailableWest Elizabeth Sanitary Authority
The scope of work generally includes the draining/cleaning of an existing wastewater treatment plant SBR basin(s) and completing concrete repairs and waterproofing/ lining system on the interior and miscellaneous mechanical repairs (piping, nuts/bolts, etc.). Construction includes the disposal of any waste materials and all necessary appurtenances and restoration for said construction.
Posted Date
Jul 18, 2025
Due Date
Sep 12, 2025
Release: Jul 18, 2025
West Elizabeth Sanitary Authority
Close: Sep 12, 2025
The scope of work generally includes the draining/cleaning of an existing wastewater treatment plant SBR basin(s) and completing concrete repairs and waterproofing/ lining system on the interior and miscellaneous mechanical repairs (piping, nuts/bolts, etc.). Construction includes the disposal of any waste materials and all necessary appurtenances and restoration for said construction.
West Elizabeth Sanitary Authority
The scope of work includes the installation of a new mechanical bar screen in the existing wastewater treatment plant headworks structure and associated electrical work including a proposed control panel and the relocation of an existing grinder control panel. Work includes all general, mechanical and electrical and all necessary appurtenances and restoration for said construction.
Posted Date
Jul 18, 2025
Due Date
Sep 12, 2025
Release: Jul 18, 2025
West Elizabeth Sanitary Authority
Close: Sep 12, 2025
The scope of work includes the installation of a new mechanical bar screen in the existing wastewater treatment plant headworks structure and associated electrical work including a proposed control panel and the relocation of an existing grinder control panel. Work includes all general, mechanical and electrical and all necessary appurtenances and restoration for said construction.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track West Elizabeth Sanitary Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database