Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Wells Fargo
Protect other Finishes, supply boom lift and access all locations. Prepare wash exterior Front of the building to remove dirt, chalk, or any surface contamination. Remove any loose checked or flaking Paint from all surfaces. Patch all cracks, open joints, voids, any concrete damage, or spalling concrete. Clean, remove rust, prime using rust inhibitive primer on any visible metal rust. Caulked any gaps, open joints, splits using elastomeric caulking. All loose window putty to be removed and replaced prior to finish painting. Prime all walls, and windows, supply and apply (2) Coats finish Paint. Including all windows and Metal structures.
Posted Date
Mar 4, 2026
Due Date
Mar 30, 2026
Release: Mar 4, 2026
Wells Fargo
Close: Mar 30, 2026
Protect other Finishes, supply boom lift and access all locations. Prepare wash exterior Front of the building to remove dirt, chalk, or any surface contamination. Remove any loose checked or flaking Paint from all surfaces. Patch all cracks, open joints, voids, any concrete damage, or spalling concrete. Clean, remove rust, prime using rust inhibitive primer on any visible metal rust. Caulked any gaps, open joints, splits using elastomeric caulking. All loose window putty to be removed and replaced prior to finish painting. Prime all walls, and windows, supply and apply (2) Coats finish Paint. Including all windows and Metal structures.
AvailableWells Fargo
Project consists of 9th floor: build-out of full floor to include 34 offices, a break room, and support spaces - storage, copy/work rooms, electrical and idf rooms. Remodel of existing restrooms with disabled access upgrades, new led lighting, finishes and furniture throughout suite, associated mechanical, electrical, and plumbing work. 8th floor: remodel of existing toilet rooms with disabled access upgrades, new led lighting and finishes, associated mechanical, electrical, and plumbing work. See outside link.
Posted Date
Nov 11, 2025
Due Date
Dec 11, 2025
Release: Nov 11, 2025
Wells Fargo
Close: Dec 11, 2025
Project consists of 9th floor: build-out of full floor to include 34 offices, a break room, and support spaces - storage, copy/work rooms, electrical and idf rooms. Remodel of existing restrooms with disabled access upgrades, new led lighting, finishes and furniture throughout suite, associated mechanical, electrical, and plumbing work. 8th floor: remodel of existing toilet rooms with disabled access upgrades, new led lighting and finishes, associated mechanical, electrical, and plumbing work. See outside link.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Wells Fargo's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database