Discover Opportunities months before the RFP drops
Learn more →Work includes the addition of a master meter, master back flow preventer, and packaged domestic and fire booster pump system and shelter. This addition also includes an extension of approx 250 LF of water main off of wayne community college entrance drive, an addition of nine, 10" isolation valves, installation of a bypass check valve and vault, connection of the packaged booster system to existing power, site/pavement repairs, implementation of required erosion and sediment control measures, installation and maintenance of traffic control, and the connection to existing private water main.
Posted Date
Nov 11, 2025
Due Date
Dec 8, 2025
Release: Nov 11, 2025
Close: Dec 8, 2025
Work includes the addition of a master meter, master back flow preventer, and packaged domestic and fire booster pump system and shelter. This addition also includes an extension of approx 250 LF of water main off of wayne community college entrance drive, an addition of nine, 10" isolation valves, installation of a bypass check valve and vault, connection of the packaged booster system to existing power, site/pavement repairs, implementation of required erosion and sediment control measures, installation and maintenance of traffic control, and the connection to existing private water main.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis