Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Wausau Community Development Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Assistant Director of Community Development Authority
Executive Director, Community Development Authority
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Wausau Community Development Authority
Provide a cloud-based public safety scheduling and time and attendance solution. The system must support the unique operational needs of public safety departments, including law enforcement, fire, and ems. Scheduling: using multiple shift types and scheduling models. Allow auto-scheduling up to 12 months in advance. Include a calendar view for supervisors and employees. Enable open shift offerings with role-based restrictions and approval workflows. Provide mobile and desktop access for scheduling and notifications. Time & attendance: track regular, overtime, sick, vacation, and compensatory time. Integrate with existing workday erp system (api integration preferred). See outside link.
Posted Date
Jan 8, 2026
Due Date
Jan 23, 2026
Release: Jan 8, 2026
Wausau Community Development Authority
Close: Jan 23, 2026
Provide a cloud-based public safety scheduling and time and attendance solution. The system must support the unique operational needs of public safety departments, including law enforcement, fire, and ems. Scheduling: using multiple shift types and scheduling models. Allow auto-scheduling up to 12 months in advance. Include a calendar view for supervisors and employees. Enable open shift offerings with role-based restrictions and approval workflows. Provide mobile and desktop access for scheduling and notifications. Time & attendance: track regular, overtime, sick, vacation, and compensatory time. Integrate with existing workday erp system (api integration preferred). See outside link.
AvailableWausau Community Development Authority
Construction of a six unit apartment building including (3) one bedroom apartments, (2) two bedroom apartments, (1) three bedroom apartment and a common laundry/mechanical room. The two bedroom apartments and common areas are one-story, the two bedroom apartments are two-story and the three bedroom apartment is a combination one-story/two-story. The building footprint is approximately 5,606 SF; the second floor is approx., 2,003 SF for a total of 7,609 SF. The building will be constructed with a poured concrete foundation, wood framed walls and a wood framed roof. Interior finishes include LVP floors, painted gypsum board walls/ceilings, plastic laminate cabinets/countertops and prehung interior wood doors. Exterior finishes include vinyl siding, composite trim, composite posts, railings, balusters, insulated vinyl windows & insulated fiberglass door systems. The work will include general construction, plumbing, fire protection, HVAC, and electrical work. Site work will include building excavation, backfilling, grading, landscaping concrete sidewalks and aprons, asphalt driveway and parking lot.
Posted Date
Nov 18, 2025
Due Date
Dec 11, 2025
Release: Nov 18, 2025
Wausau Community Development Authority
Close: Dec 11, 2025
Construction of a six unit apartment building including (3) one bedroom apartments, (2) two bedroom apartments, (1) three bedroom apartment and a common laundry/mechanical room. The two bedroom apartments and common areas are one-story, the two bedroom apartments are two-story and the three bedroom apartment is a combination one-story/two-story. The building footprint is approximately 5,606 SF; the second floor is approx., 2,003 SF for a total of 7,609 SF. The building will be constructed with a poured concrete foundation, wood framed walls and a wood framed roof. Interior finishes include LVP floors, painted gypsum board walls/ceilings, plastic laminate cabinets/countertops and prehung interior wood doors. Exterior finishes include vinyl siding, composite trim, composite posts, railings, balusters, insulated vinyl windows & insulated fiberglass door systems. The work will include general construction, plumbing, fire protection, HVAC, and electrical work. Site work will include building excavation, backfilling, grading, landscaping concrete sidewalks and aprons, asphalt driveway and parking lot.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.