Learn more →Improvements to the wastewater treatment plant will replace aging equipment and provide more efficient means of treatment. Installation of a new automatic bar screening system, diffused aeration system, and UV disinfection system. Replacement of a wet well pump and a backup generator. Upgrades to the wastewater treatment plants electrical service, process piping, disinfection building, and miscellaneous building improvements.
Posted Date
Aug 25, 2025
Due Date
Oct 2, 2025
Release: Aug 25, 2025
Close: Oct 2, 2025
Improvements to the wastewater treatment plant will replace aging equipment and provide more efficient means of treatment. Installation of a new automatic bar screening system, diffused aeration system, and UV disinfection system. Replacement of a wet well pump and a backup generator. Upgrades to the wastewater treatment plants electrical service, process piping, disinfection building, and miscellaneous building improvements.
Work includes unclassified excavation 1575 CY; 12" HDPE pipe 1,060 LF; catch basin no. 2-2C 4 EA; storm manhole 4 EA; aggregate walk 4" 1,035 SY; separation fabric (gravel trail) 1035 sy; special - concrete basketball court 1 LS; basketball court 10' chain link fence 475 LF; fence, misc : privacy fence 22 LF; asphalt striping (parking stripes) 1 LS; asphalt surface course 1.5" 450 TN; asphalt intermediate course - 3" 900 ton; aggregate base - 6" 170 CY; separation fabric (asphalt) 515 SY; topsoil CY; special - concrete parking block 77 EA; seeding and mulching, class 1 0.5 ac; mobilization 1 LS; erosion and sediment control 1 LS; demolition 1 LS.
Posted Date
Aug 4, 2025
Due Date
Sep 8, 2025
Release: Aug 4, 2025
Close: Sep 8, 2025
Work includes unclassified excavation 1575 CY; 12" HDPE pipe 1,060 LF; catch basin no. 2-2C 4 EA; storm manhole 4 EA; aggregate walk 4" 1,035 SY; separation fabric (gravel trail) 1035 sy; special - concrete basketball court 1 LS; basketball court 10' chain link fence 475 LF; fence, misc : privacy fence 22 LF; asphalt striping (parking stripes) 1 LS; asphalt surface course 1.5" 450 TN; asphalt intermediate course - 3" 900 ton; aggregate base - 6" 170 CY; separation fabric (asphalt) 515 SY; topsoil CY; special - concrete parking block 77 EA; seeding and mulching, class 1 0.5 ac; mobilization 1 LS; erosion and sediment control 1 LS; demolition 1 LS.
Installation of 2,700 LF of 8" Ductile Iron water line. The water line will have 26 service connections of varying sizes, 10 gate valves of varying sizes, 6 tie-ins to existing water lines, and 5 fire hydrant assemblies. Also, a storm sewer extension consisting of 1,100 LF of 12" PVC pipe, 5 storm sewer catch basins, 3 storm manholes, and 1 junction chamber.
Posted Date
Oct 1, 2024
Due Date
Oct 22, 2024
Release: Oct 1, 2024
Close: Oct 22, 2024
Installation of 2,700 LF of 8" Ductile Iron water line. The water line will have 26 service connections of varying sizes, 10 gate valves of varying sizes, 6 tie-ins to existing water lines, and 5 fire hydrant assemblies. Also, a storm sewer extension consisting of 1,100 LF of 12" PVC pipe, 5 storm sewer catch basins, 3 storm manholes, and 1 junction chamber.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis