Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes unclassified excavation 1575 CY; 12" HDPE pipe 1,060 LF; catch basin no. 2-2C 4 EA; storm manhole 4 EA; aggregate walk 4" 1,035 SY; separation fabric (gravel trail) 1035 sy; special - concrete basketball court 1 LS; basketball court 10' chain link fence 475 LF; fence, misc : privacy fence 22 LF; asphalt striping (parking stripes) 1 LS; asphalt surface course 1.5" 450 TN; asphalt intermediate course - 3" 900 ton; aggregate base - 6" 170 CY; separation fabric (asphalt) 515 SY; topsoil CY; special - concrete parking block 77 EA; seeding and mulching, class 1 0.5 ac; mobilization 1 LS; erosion and sediment control 1 LS; demolition 1 LS.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The work includes the construction of: site clearing, erosion control. site concrete, storm sewer improvements, and restoration.
Posted Date
Nov 24, 2025
Due Date
Jan 7, 2026
Release: Nov 24, 2025
Close: Jan 7, 2026
The work includes the construction of: site clearing, erosion control. site concrete, storm sewer improvements, and restoration.
AvailableThe Project consists of dredging the existing pond and forebay, and construction of a new fiberglass pedestrian bridge, storm sewer system, sidewalk, concrete curb and gutter, asphalt paving, signage and marking, and landscaping and other necessary associated work and materials necessary for the completion of the project.
Posted Date
Dec 2, 2025
Due Date
Jan 8, 2026
Release: Dec 2, 2025
Close: Jan 8, 2026
The Project consists of dredging the existing pond and forebay, and construction of a new fiberglass pedestrian bridge, storm sewer system, sidewalk, concrete curb and gutter, asphalt paving, signage and marking, and landscaping and other necessary associated work and materials necessary for the completion of the project.
AvailableMemorial gazebo rehabilitation and improvements.
Posted Date
Dec 14, 2025
Due Date
Jan 14, 2026
Release: Dec 14, 2025
Close: Jan 14, 2026
Memorial gazebo rehabilitation and improvements.
AvailableThe Project consists of reinforced concrete pad, concrete sidewalk, ADA parking spaces, electric work, and the installation of signs.
Posted Date
Dec 1, 2025
Due Date
Dec 26, 2025
Release: Dec 1, 2025
Close: Dec 26, 2025
The Project consists of reinforced concrete pad, concrete sidewalk, ADA parking spaces, electric work, and the installation of signs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis