Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Village of New Knoxville
The repaving of St. Marys street from South Street to Spring Street, replacing water services, and reconstructing existing curb ramps that are not ADA compliant.
Posted Date
-
Due Date
Jul 9, 2026
Release: -
Village of New Knoxville
Close: Jul 9, 2026
The repaving of St. Marys street from South Street to Spring Street, replacing water services, and reconstructing existing curb ramps that are not ADA compliant.
AvailableVillage of New Knoxville
The Project includes the following Work: Reconstruction of Hoge Street and Mill Street between Main Street and Botkins Angle Road (approx. 620') with new curb and gutter, sidewalks, and storm sewer within the Village.
Posted Date
Oct 22, 2025
Due Date
Nov 5, 2025
Release: Oct 22, 2025
Village of New Knoxville
Close: Nov 5, 2025
The Project includes the following Work: Reconstruction of Hoge Street and Mill Street between Main Street and Botkins Angle Road (approx. 620') with new curb and gutter, sidewalks, and storm sewer within the Village.
Village of New Knoxville
Provide demolition of approx 38' of 12" DI force main and the removal of existing concrete barriers (3). The work shall also include the installation of approx 35' of 12" DI force main, a new 12' by 8' precast valve and meter vault, new 8" magnetic flow meter, new wastewater combination air valve, new 8" and 12" DI piping and fittings; core drilling through precast structures, a new telemetry system, electrical modifications, grading and seeding; stone driveway replacement, and bypass pumping.
Posted Date
May 7, 2025
Due Date
May 28, 2025
Release: May 7, 2025
Village of New Knoxville
Close: May 28, 2025
Provide demolition of approx 38' of 12" DI force main and the removal of existing concrete barriers (3). The work shall also include the installation of approx 35' of 12" DI force main, a new 12' by 8' precast valve and meter vault, new 8" magnetic flow meter, new wastewater combination air valve, new 8" and 12" DI piping and fittings; core drilling through precast structures, a new telemetry system, electrical modifications, grading and seeding; stone driveway replacement, and bypass pumping.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge