Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Village of Jackson
This project is part of a WisDOT Local Roads Improvement Program (LRIP) project, which consists of road improvements of existing road; including hot mix asphalt pavement, crushed aggregate base course, recycled asphalt on shoulders, and concrete curb and gutter construction.
Posted Date
Jun 24, 2026
Due Date
Jul 9, 2026
Release: Jun 24, 2026
Village of Jackson
Close: Jul 9, 2026
This project is part of a WisDOT Local Roads Improvement Program (LRIP) project, which consists of road improvements of existing road; including hot mix asphalt pavement, crushed aggregate base course, recycled asphalt on shoulders, and concrete curb and gutter construction.
AvailableVillage of Jackson
Aeration basins (east and west) - remove the existing aeration equipment, raise the walls of the tanks by 4'-0", and install new aeration equipment, mixers, and piping per the drawings. Work also includes the addition of equipment platforms and electrical modifications to the structure and site. Aeration basins control building - raise the floor of the existing building by 12" and install new electrical and control equipment within this building. Site work - remove and replace the existing sidewalks around the basins, as well as miscellaneous site piping modifications and regrading of the project area.
Posted Date
Feb 12, 2026
Due Date
Mar 11, 2026
Release: Feb 12, 2026
Village of Jackson
Close: Mar 11, 2026
Aeration basins (east and west) - remove the existing aeration equipment, raise the walls of the tanks by 4'-0", and install new aeration equipment, mixers, and piping per the drawings. Work also includes the addition of equipment platforms and electrical modifications to the structure and site. Aeration basins control building - raise the floor of the existing building by 12" and install new electrical and control equipment within this building. Site work - remove and replace the existing sidewalks around the basins, as well as miscellaneous site piping modifications and regrading of the project area.
Village of Jackson
Project include approx 7,700 CY Excavation Common; 13,000 TONS Base Aggregate Dense; 4,100 TONS HMA Pavement; 7,630 LF Concrete Curb and Gutter; 24,380 SF Concrete Sidewalk; 2,650 SY Concrete Driveway; 22 EA Lighting Unit; 14,200 SY Restoration; 3,130 LF Storm Sewer Main; 3,070 LF Storm Sewer Lateral; 12 EA Adjust Sanitary Sewer Manhole Cover; 21 EA Adjust Water Valve Box; 44 EA Replace Water Service Curb Box. See outside link.
Posted Date
Feb 3, 2026
Due Date
Feb 17, 2026
Release: Feb 3, 2026
Village of Jackson
Close: Feb 17, 2026
Project include approx 7,700 CY Excavation Common; 13,000 TONS Base Aggregate Dense; 4,100 TONS HMA Pavement; 7,630 LF Concrete Curb and Gutter; 24,380 SF Concrete Sidewalk; 2,650 SY Concrete Driveway; 22 EA Lighting Unit; 14,200 SY Restoration; 3,130 LF Storm Sewer Main; 3,070 LF Storm Sewer Lateral; 12 EA Adjust Sanitary Sewer Manhole Cover; 21 EA Adjust Water Valve Box; 44 EA Replace Water Service Curb Box. See outside link.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize; there’s no track record—pivot to coops instead.
Coops: Lead with a Sourcewell purchase to bypass formal bidding and buy immediately.
Village of Jackson: No evidence of sole source awards or precedent in policy. Treat as high-friction, low-probability; avoid unless absolutely unavoidable.
Board meetings and strategic plans from Village of Jackson
The board discussed the extension of sewer and water services for the Lamm's Corner development and recommended approval. Financial requests for the Willow Ridge Reconstruction Project and the Coffee Connection Trail Project were approved. The board authorized the purchase of a new sewer utility vacuum truck, subject to specific vehicle specifications and warranty conditions. Additionally, the board reviewed the five-year capital improvements program, the public works equipment program, and the upcoming budget for public works and utilities. The meeting concluded with a review of the Director of Public Works report and an inquiry regarding potential village land acquisition.
The board meeting involved several key items, including the ceremonial oath of office for a police officer and the approval of the Brownfields Assessment Coalition Memorandum of Agreement. Financial approvals included multiple pay requests for the municipal complex and road extension projects, the purchase of a water utility truck, and the replacement of a fire department administration vehicle. The board also authorized an audit services engagement, an amendment to an assessment contract, and denied two insurance liability claims. Additionally, updates were provided on the municipal complex construction, various department activities including upcoming community events, and a COVID-19 update. The board concluded by approving an increase in wages for poll workers and chief inspectors and entering into a closed session regarding personnel and legal matters.
The meeting included discussions on a new yard waste site policy for residents, including operational hours and camera monitoring. Preliminary assessments were reviewed and recommended for the Chateau Drive and Hickory Lane reconstruction project, as well as for the Sherman Road drainage and Jackson Park Alley reconstruction project. The Board reviewed the progress of a limited water service study, discussed village informational signs, and received a report from the Director of Public Works covering utility and infrastructure updates. Additionally, updates were provided regarding the Cedar Creek Connection event, site demolition on the Schmahl property, and construction status on Jackson Drive and local subdivision infrastructure.
The commission reviewed and recommended approval for several conditional use permits, including one for a dog training facility, one for a new pizza restaurant, and others for planned unit development amendments involving a privacy fence and an attached garage. Furthermore, the commission initiated discussions regarding a possible chicken ordinance and the potential implementation of designated truck routes within the village, both of which were referred for further review at the next meeting with additional input from relevant departments.
The commission recommended the approval of the Final Plat for Phase I of the Maple Fields Subdivision to the Village Board. A proposal to amend an ordinance regarding meeting date changes for the commission was tabled for future consideration. Additionally, the commission moved to have staff draft an ordinance amendment concerning the administrative approval process for signs that conform to existing village regulations.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Village of Jackson's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge