Learn more →Proposed improvement consists of the cleaning and closed-circuit television inspection of approx. 44,967 LF of various size sanitary main and 17,863 LF of various size storm sewers.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Close: Dec 16, 2025
Proposed improvement consists of the cleaning and closed-circuit television inspection of approx. 44,967 LF of various size sanitary main and 17,863 LF of various size storm sewers.
AvailableThe Village of Bloomingdale, Illinois is soliciting sealed bids for materials procurement related to its FY26 Sanitary Mainline, Hydrant, and Valve Improvement Program, including hydrants, valves, and fittings. Bids are due to the Village Clerk’s office by 10:00 a.m. on Wednesday, December 3, 2025.
Posted Date
Nov 13, 2025
Due Date
Dec 3, 2025
Release: Nov 13, 2025
Close: Dec 3, 2025
The Village of Bloomingdale, Illinois is soliciting sealed bids for materials procurement related to its FY26 Sanitary Mainline, Hydrant, and Valve Improvement Program, including hydrants, valves, and fittings. Bids are due to the Village Clerk’s office by 10:00 a.m. on Wednesday, December 3, 2025.
Exterior: High pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane system. Foundation: Repair grout. Water clean and apply a two (2) coat epoxy system. Repairs: 1)Install deflector bars on the fill/draw pipe. 2)Overflow discharge modification. 3)Install additional attachment clamps on the leg ladder fall prevention device. 4)Install a vandal guard. 5)Balcony drain holes. 6)Balcony access modification. 7)Install a roof handrail with a painter's railing. 8)Adjust the loose sway rods. 9)Repair damaged electrical conduit. 10)Install grounding rods for the structure.
Posted Date
Oct 14, 2025
Due Date
Nov 12, 2025
Release: Oct 14, 2025
Close: Nov 12, 2025
Exterior: High pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane system. Foundation: Repair grout. Water clean and apply a two (2) coat epoxy system. Repairs: 1)Install deflector bars on the fill/draw pipe. 2)Overflow discharge modification. 3)Install additional attachment clamps on the leg ladder fall prevention device. 4)Install a vandal guard. 5)Balcony drain holes. 6)Balcony access modification. 7)Install a roof handrail with a painter's railing. 8)Adjust the loose sway rods. 9)Repair damaged electrical conduit. 10)Install grounding rods for the structure.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis