Village of Bloomingdale
Exterior: High pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane system. Foundation: Repair grout. Water clean and apply a two (2) coat epoxy system. Repairs: 1)Install deflector bars on the fill/draw pipe. 2)Overflow discharge modification. 3)Install additional attachment clamps on the leg ladder fall prevention device. 4)Install a vandal guard. 5)Balcony drain holes. 6)Balcony access modification. 7)Install a roof handrail with a painter's railing. 8)Adjust the loose sway rods. 9)Repair damaged electrical conduit. 10)Install grounding rods for the structure.
City of Wyoming
10,000 gallon concrete reservoir (gezon #3) exterior roof overcoat and miscellaneous repairs.
City of Bellbrook
Exterior: High pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane system. Foundation: Repair spalls. Water clean and apply a two (2) coat epoxy system. Repairs: 1) Replace one sidewall manway. 2) Install a gasket on the wet interior roof hatch. 3) Install deflector bars on the fill/draw pipe. 4) Overflow discharge modification. 5) Install a swing gate at the roof step-off platform opening. 6) Install a roof handrail with a painter’s railing. 7) Install grounding rods for the structure.
City of Meigs
Construct the proposed 200,000 gallon elevated water storage tank. In general, construction consists of a multi-column elevated water storage tank, foundation, water main, fire hydrant, fencing, electrical, FAA obstruction lighting and all other associated appurtenances necessary for a complete installation.
Release
Oct 14, 2025
Close
Nov 12, 2025