City of Bellbrook
Exterior: High pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane system. Foundation: Repair spalls. Water clean and apply a two (2) coat epoxy system. Repairs: 1) Replace one sidewall manway. 2) Install a gasket on the wet interior roof hatch. 3) Install deflector bars on the fill/draw pipe. 4) Overflow discharge modification. 5) Install a swing gate at the roof step-off platform opening. 6) Install a roof handrail with a painter’s railing. 7) Install grounding rods for the structure.
Village of Bloomingdale
Exterior: High pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane system. Foundation: Repair grout. Water clean and apply a two (2) coat epoxy system. Repairs: 1)Install deflector bars on the fill/draw pipe. 2)Overflow discharge modification. 3)Install additional attachment clamps on the leg ladder fall prevention device. 4)Install a vandal guard. 5)Balcony drain holes. 6)Balcony access modification. 7)Install a roof handrail with a painter's railing. 8)Adjust the loose sway rods. 9)Repair damaged electrical conduit. 10)Install grounding rods for the structure.
City of Wyoming
10,000 gallon concrete reservoir (gezon #3) exterior roof overcoat and miscellaneous repairs.
Nail Swain Water Association
Sandblast and paint interior and exterior of existing 105,000 gallon standpipe. Surface repairs to concrete base. Furnish and install a passive mixing system on pipe inlet. New float and flag system on tank. Overflow pipe extension with splash pad installation. Sampling and sanitation station improvements.
Release
Oct 23, 2025
Close
Nov 14, 2025