Discover Opportunities months before the RFP drops
Learn more →Installation of approx. 12,000 LF of 8" water main including but not limited to replacement of existing water services to curb stops/boxes, installation of water meter pits, testing and disinfection of the new water main, abandonment-in-place of the existing water main between connection points, traffic controls, erosion and sediment controls, and associated pavement and landscape restoration as shown on the construction drawings and as specified in the Project Manual. In certain instances, the work may entail replacement of water services from building to meter pit/curb stop based on service material (i.e., if existing service material determined to be lead or galvanized requiring replacement).
Posted Date
Dec 4, 2025
Due Date
Jan 6, 2026
Release: Dec 4, 2025
Close: Jan 6, 2026
Installation of approx. 12,000 LF of 8" water main including but not limited to replacement of existing water services to curb stops/boxes, installation of water meter pits, testing and disinfection of the new water main, abandonment-in-place of the existing water main between connection points, traffic controls, erosion and sediment controls, and associated pavement and landscape restoration as shown on the construction drawings and as specified in the Project Manual. In certain instances, the work may entail replacement of water services from building to meter pit/curb stop based on service material (i.e., if existing service material determined to be lead or galvanized requiring replacement).
AvailableWork includes to reduce sediment and associated pollutant/contaminant loads, improve water quality and enhance aquatic habitat conditions within the macoby creek, installing strategically designed streambank stabilization and habitat improvement structures within an approx 500' reach.
Posted Date
Jun 29, 2025
Due Date
Aug 7, 2025
Release: Jun 29, 2025
Close: Aug 7, 2025
Work includes to reduce sediment and associated pollutant/contaminant loads, improve water quality and enhance aquatic habitat conditions within the macoby creek, installing strategically designed streambank stabilization and habitat improvement structures within an approx 500' reach.
Provide road materials. Approx 200 TN pa #1 aggregate; approx 500 TN pa #1b aggregate; approx 500 TN pa #2a aggregate; approx 500 TN pa #2b aggregate; asphalt approx 100 TNupm permanent pavement patch; approxi 2500 TN superpave asphalt mixture design 9.5 mm, pg 64s-22, wearing course 0.3 to 3.0 million esal's, srl m 1.5" depth. Equipment rental: approx 50 hr each - Bituminous paver w/operator, screed operator and two laborers – moving
Posted Date
Jan 29, 2025
Due Date
Feb 11, 2025
Release: Jan 29, 2025
Close: Feb 11, 2025
Provide road materials. Approx 200 TN pa #1 aggregate; approx 500 TN pa #1b aggregate; approx 500 TN pa #2a aggregate; approx 500 TN pa #2b aggregate; asphalt approx 100 TNupm permanent pavement patch; approxi 2500 TN superpave asphalt mixture design 9.5 mm, pg 64s-22, wearing course 0.3 to 3.0 million esal's, srl m 1.5" depth. Equipment rental: approx 50 hr each - Bituminous paver w/operator, screed operator and two laborers – moving
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis