Discover Opportunities months before the RFP drops
Learn more →Work includes replacing all indoor units with new floor-mounted equipment and all three outdoor condensing units. New units will utilize building chilled water, dx, and free-cooling sources to meet energy codes, with controls to alternate between units. The current air distribution will be modified to provide adequate air flow to servers. Demolition of all existing ceiling- mounted crac units, overhead water piping and associated infrastructure. New units will be tied into the existing campus building automation system, including leak detection.
Posted Date
Jun 2, 2025
Due Date
Jul 18, 2025
Release: Jun 2, 2025
Close: Jul 18, 2025
Work includes replacing all indoor units with new floor-mounted equipment and all three outdoor condensing units. New units will utilize building chilled water, dx, and free-cooling sources to meet energy codes, with controls to alternate between units. The current air distribution will be modified to provide adequate air flow to servers. Demolition of all existing ceiling- mounted crac units, overhead water piping and associated infrastructure. New units will be tied into the existing campus building automation system, including leak detection.
Provide the labor and materials necessary for campus wide trash pickup and disposal services and also single stream recycling removal services.
Posted Date
May 15, 2025
Due Date
Jun 5, 2025
Release: May 15, 2025
Close: Jun 5, 2025
Provide the labor and materials necessary for campus wide trash pickup and disposal services and also single stream recycling removal services.
Project includes complete tear-off of existing roofing system to roof deck and installation of new roofing system and associated flashings and accessories. Existing roof-top HVAC equipment and existing parapet metal coping will remain in place with new couterflashings installed.
Posted Date
May 31, 2024
Due Date
Jun 21, 2024
Release: May 31, 2024
Close: Jun 21, 2024
Project includes complete tear-off of existing roofing system to roof deck and installation of new roofing system and associated flashings and accessories. Existing roof-top HVAC equipment and existing parapet metal coping will remain in place with new couterflashings installed.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis