Discover Opportunities months before the RFP drops
Learn more →DESIGN-BUILD: Design and construction documents for construction work needed for the university student housing, faculty housing, athletics, other urgently needed construction, and emergency work for the university.
Posted Date
Nov 26, 2025
Due Date
Jan 8, 2026
Release: Nov 26, 2025
Close: Jan 8, 2026
DESIGN-BUILD: Design and construction documents for construction work needed for the university student housing, faculty housing, athletics, other urgently needed construction, and emergency work for the university.
AvailableSelective demolition and removal; concrete formwork; concrete reinforcement; cast-in-place concrete; structural steel; metal fabrications; rough carpentry; carpentry; preservative treated lumber; preformed metal roofing; fiber cement siding; elastomeric waterproof deck coating; flashing and sheet metal; sealants; metal doors and frames; flush wood doors; vinyl window; finish hardware; gypsum wallboard; resilient tile floor; painting; markerboards and tackboards; miscellaneous specialties; asbestos abatement; lead paint control measures; handling and disposal of mercury containing lamps; testing and air monitoring; general mechanical requirements; insulation of mechanical systems; air conditioning and ventilation; testing, adjusting and balancing (TAB); basic electrical requirements; electrical demolition; grounding and bonding; hangers & supports for electrical systems; electrical identification; conductors & cables; raceways and boxes; wiring devices; interior lighting, fire alarm system; and miscellaneous items
Posted Date
Nov 19, 2025
Due Date
Dec 30, 2025
Release: Nov 19, 2025
Close: Dec 30, 2025
Selective demolition and removal; concrete formwork; concrete reinforcement; cast-in-place concrete; structural steel; metal fabrications; rough carpentry; carpentry; preservative treated lumber; preformed metal roofing; fiber cement siding; elastomeric waterproof deck coating; flashing and sheet metal; sealants; metal doors and frames; flush wood doors; vinyl window; finish hardware; gypsum wallboard; resilient tile floor; painting; markerboards and tackboards; miscellaneous specialties; asbestos abatement; lead paint control measures; handling and disposal of mercury containing lamps; testing and air monitoring; general mechanical requirements; insulation of mechanical systems; air conditioning and ventilation; testing, adjusting and balancing (TAB); basic electrical requirements; electrical demolition; grounding and bonding; hangers & supports for electrical systems; electrical identification; conductors & cables; raceways and boxes; wiring devices; interior lighting, fire alarm system; and miscellaneous items
AvailableInterior renovation of holmes hall rooms, painting, installing floor sealer, spray fireproofing, patching and repairing walls and surfaces, installing a pipe railing gate and fence at 140c, and all necessary structural, plumbing, mechanical and electrical work, and hazardous material abatement.
Posted Date
Nov 17, 2025
Due Date
Dec 16, 2025
Release: Nov 17, 2025
Close: Dec 16, 2025
Interior renovation of holmes hall rooms, painting, installing floor sealer, spray fireproofing, patching and repairing walls and surfaces, installing a pipe railing gate and fence at 140c, and all necessary structural, plumbing, mechanical and electrical work, and hazardous material abatement.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis